Laserfiche WebLink
To: \lr. Petcr Hai, <br /> Date. Febwai-y 21, 20221 <br /> Paw 24 <br /> DUNN PIT NEW PERMIT APPLICATION, EXHIBITS F, G AND <br /> APPENDIX D REVIEW MEMO, FILE NO. M2021-059: MEMO <br /> FROM PATRICK LENNBERG, DRMS TO PETER HAYS, DRMS <br /> Exhibit F <br /> Comment I <br /> Please show the Hill and Brush Ditch orientation on the Reclamation Plan Map. <br /> Response I <br /> The Hill and Brush Ditch is labeled on all revised plates of Exhibit F (Attachment 6). <br /> Exhibit G <br /> Comment 1 <br /> On Figure 2 the decreed surface water feature for the Hill and Brush Ditch is missing, <br /> please update the figure. <br /> Response I <br /> Hill and Brush Ditch has been added to Figure 2 (Attachment 8). <br /> Comment 2 <br /> On Figure 2 the decreed groundwater feature for the Mad Russian Well (0405661) and <br /> constructed well (59968-F), and the 10 monitoring wells are missing please update. <br /> Response 2 <br /> DWR Map Viewer shows a permit issued for Mad Russian Well (0405661); however, no <br /> record or physical identification of a constructed well was found. Updated Figure 2 <br /> contains the 10 LRM monitoring wells (Attachment 8). <br /> Appendix D <br /> Comment 1 <br /> The applicant states, page 6, they will measure water levels in the 10 monitoring wells, <br /> installed in Summer 2021, monthly for one year then quarterly thereafter. The Division <br /> believes monthly water level monitoring should occur for at least one year after mining <br /> activities have begun to verify the numerical models predictions and monitor the effects of <br /> mining on the surrounding groundwater system. <br /> 20220209_1045_DRMS_Adequacy_Review_Response_MASTE <br /> R.docx TELESTO <br />