Laserfiche WebLink
O: `lr. Pctcr IbN S <br /> Datc: February 21, 2022 <br /> Pagc 16 <br /> a platform is used beneath the excavator to distribute the weight. The Applicant proposed <br /> a mining slope of 1.5HJ V in Exhibit D - Mining Plan. Please revise Exhibit D to <br /> incorporate the requirements of the geotechnical stability report. <br /> Response 37 <br /> Attachment 13 corrects the discrepancy. Updates in Sections 6.1.2 and 6.2 specify that <br /> LRM mine at slopes and with appurtenances indicated by the slope stability analyses <br /> presented in Appendix B 1 (Attachment 12). <br /> 20220209_1045_DRMS_Adeguacy_Review_Response_MASTE <br /> R.docx TELEST© <br />