Laserfiche WebLink
To: Mr. Peter Ha\: <br /> Date Fchrualti 21, 2022 <br /> Pa,2c I I <br /> Table 1 Requested Placeholder Bond Amount <br /> COST SUNLNIARY WORK <br /> Task description: Dann Pit Bond Estimate <br /> Site- Dann Pit Permit Action' Bond Estimate Permit Job--- \L021059 <br /> PROJECT IDEN=CAT10\ <br /> Task=: 000 State Colorado Abbreviation None <br /> Date: 12 22 2021 Count Weld Filename' N1059-o00 <br /> User PSH <br /> Agency or organization name DR%1S <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet TaskHaars <br /> Description Used Stzc Cost <br /> 001 Revegetate Cl Shoreline REtiEGE 1 40.00 St,SSa <br /> 002 TopsoilCl Shoreline TRCCKI 1 13.06 S6,111 <br /> 003 Reyegetate Cl Wetlands MEGE 1 20.00 $Lilo <br /> 004 Slope Cl West Slope DOZER 1 3'2 S629 <br /> 005 Rip.access Road RIPPER 1 0.13 5132 <br /> 006 Revegetate access Road REVEGE 1 2000 S1*161 <br /> 00- Mob Demob MOBILIZE 1 5.3' S3 619 <br /> OOS Bond to Bac M Cl ur*d.a ugmentation Decree SrM%1 AT 1 16000 5300,000 <br /> Placeholder E-"ACE <br /> 262.88 S313,082 <br /> SUBTOTALS: <br /> DM ERECT COSTS <br /> OVERHEAD AND PROFIT. <br /> Liability assurance. .102 Total= S6,313 <br /> Performance bond. 1.05 Total= S3,293 <br /> Job superintendent t31.+4 Iotal= 59.16E <br /> Profit. 1000 Total= S31,10S <br /> IOTAL 0 S P- 550,519 <br /> CON MALT A-%IOLtiT(direct-0&P)— S363.601 <br /> LEGAL-T\GD;EERLNG-PROJECT\La\AGENILN-T <br /> Financralwarrantyprocessasg(legal related costs}. S500 Total= S500 <br /> Engaseerasg work-and orcontractbrdpreparation. 1,2: Total= S13,M <br /> Reclamation management and or administration: 500 $15,704 <br /> CONTME\CY 000 Total= SO <br /> TOTAL L\DMECT COST= $29,553 <br /> TOTAL PLACEHOLDER BOND)WOUNT(direct+ <br /> 5393,000 Kne <br /> indirect)= aded <br /> 20220209_1045_DBMS_Adequacy_Review_Response_MASTE <br /> Rdocx TELESTG <br />