Laserfiche WebLink
prior to seeding in order to achieve an even distribution of fertilizer over the entire area. It is <br /> estimated that 1,800 pounds of fertilizer will be required. <br /> Mulch: Certified weed-free straw mulch will be applied to all disturbed areas at the rate of two <br /> (2)tons per acre. Mulch will be provided by CONTRACTOR. Mulch must be evenly <br /> distributed over the soil surface within 48 hours after seeding, and can be applied to the site by <br /> hand or mulch blower. Mulch must be crimped in either by hand or mechanically. <br /> Documentation of weed free certification must be provided to the Project Manager prior to <br /> application of the mulch. It is estimated that 6 tons of weed free straw mulch will be required. <br /> All terms and conditions of the Discretionary Purchase other than as changed by this <br /> amendment remain the same. <br /> Receipt and acceptance of this amendment shall be acknowledged on the REVISED Bid Schedule <br /> and by submitting the REVISED Bid Schedule. <br /> Page 2 of 3 <br />