Laserfiche WebLink
Page 2 <br /> Mr. Peter Hays <br /> February 1st, 2022 <br /> Applicant/Operator or Company Name section of the application form to indicate"Jalisco <br /> International, Inc." This has been revised and included with this letter. <br /> 5. The Division requires the application form list the exact company name registered with the <br /> Colorado Secretary of State office, "as "Jalisco International, Inc.". On Page 8 of the application <br /> form, the Applicant lists the company name in the notary section of the application form as <br /> "Jalisco International, Inc". Please revise the company name in the notary section of the <br /> application form to indicate "Jalisco International, Inc." This has been revised and included with this <br /> letter. <br /> 6.3.1 Exhibit A-Legal Description <br /> 6. Rule 6.3.1(1)states the legal description must identify the affected land, specify affected areas <br /> and be adequate to field locate the property. Description shall be by(A)township, range, and <br /> section, to at least the nearest quarter quarter section, and(B), location of the main entrance to <br /> the mine site reported as latitude and longitude, or the Universal Transverse Mercator(UTM) <br /> Grid as determined from a USGS topographic map. A metes and bounds survey description is <br /> acceptable in lieu of township, range, and section. Where available, the street address or lot <br /> number(s)shall be given. This information maybe available from the County Assessor's office <br /> or U.S. Geological Survey(USGS)maps. <br /> The Applicant failed to provide the quarter/quarter section location information for the proposed <br /> center of the area where the majority of the mining operation will occur. Please revised Exhibit A <br /> to indicate the quarter/quarter section location information for the mine site. Exhibit A has been revised to <br /> include the following proposed quarter/quarter section location of the center of the mine site: <br /> PROPOSED CENTER AREA WHERE THE MAJORITY OF MINING WILL OCCUR IS IN THE <br /> SOUTHEAST QUARTER(SE114)OF THE NORTHWEST QUARTER(NW114)OF SECTION <br /> TWENTY(20)TOWNSHIP FOUR(4) NORTH, RANGE SIXTY-SIX(66)WEST OF THE 6TH P.M., <br /> COUNTY OF WELD, STATE OF COLORADO <br /> 6.3.3 Exhibit C-Mining Plan <br /> 7. The Applicant states in the event that the topsoil is not utilized within 1 year vegetative cover <br /> will be planted. Please commit to seeding stockpiles which have been in place for 180 days and <br /> provide a seed mixture as pounds of pure live seed(PLS)per acre.The mining plan has been <br /> updated to state that stockpiles that have been in place for 180 days will be seeded with the <br /> Weld County seed mixture provided below. <br /> Areas South of County Road 68 <br /> • Mix Western Wheatgrass (Arriba, Barton, Rosana) 2.50 Ibs pislacre <br /> • Blue Grama (Hachital, Lovington) 1.50 Ibs plslacre <br /> • Sideoats Grama (Vaughn, Butte, Niner, El Reno, Haskell)2.25 Ibs pis/acre <br /> • Smooth Brome (Lincoln, Manchar) 2.00 Ibs pis/acre <br /> • Sand dropseed 0.25 Ibs pis/acre <br /> • Perennial Ryegrass (Calibra or Garibaldi tetraploid) 0.75 Ibs plslacre <br /> • Slender Wheatgrass (Pryor, Revenue or San Luis)2.50 Ibs pis/acre <br /> • Alkaligrass (Fults II, Salt on Sea) 1.25 Ibs pis/acre <br /> • Switchgrass (Nebraska 28, Blackwell) 1.00 Ibs pis/acre Total: 14.00 pound <br /> pis/acre <br />