Laserfiche WebLink
These features must be shown on the Exhibit E-Map.If ponds are part of the <br /> Reclamation Plan,slopes from 5 vertical feet above to 10 vertical feet below the expected <br /> average water level cannot be steeper than 3H:1V;remaining slope lengths may not be <br /> steeper than 2H:1V. Where wildlife habitat is the proposed future land use,shorelines <br /> should be irregularly shaped to promote a diverse wildlife habitat. The Colorado Division <br /> of Wildlife(DOM must be consulted where wildlife use is the proposed future land use. <br /> The main pit will remain after reclamation and will either be water storage or a infiltration pond. <br /> The whole reclamation slope will be reclaimed at a 3:1 slope. <br /> (e) Specify the reclamation treatment of any waste rock dumps, underground mine <br /> openings, ditches,sediment control facilities,buildings and other features specified in <br /> your mine plan but not previously addressed in the Reclamation Plan narrative. These <br /> features must be shown on Exhibit E-Map. This should describe the measures taken to <br /> minimize disturbance to the hydrologic balance,prevent off-site damage,and provide <br /> for a stable configuration consistent with the proposed future land use. <br /> All features have been addressed. <br /> Section 20—Gravel Mine—MLRB 111 Permit Application <br /> Exhibit D-3 <br />