My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-09_PERMIT FILE - M2021046 (7)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021046
>
2022-02-09_PERMIT FILE - M2021046 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:07 PM
Creation date
2/9/2022 3:02:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021046
IBM Index Class Name
Permit File
Doc Date
2/9/2022
Doc Name Note
Adequacy Response Application Revisions
Doc Name
Adequacy Review Response
From
Zephyr Gold USA Ltd
To
DRMS
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task Description: Constructing Engineered Cover for FTSF Task# 001A <br /> Site: Dawson Gold Mine <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: C730 Truck (2) CAT 950 Loader CatD8 Dozer 2500 gallon water truck <br /> Unit Cost/Hour: $ 129.72 $ 259.44 $ 95.37 $ 191.83 $ 57.56 <br /> Unit Production: 18.06 LCY <br /> 108.36 LCY/Hr 528.59 LCY/Hr <br /> 216.72 LCY/HR for 2 trucks <br /> CAP ACREAGE 11 acres <br /> MATERIAL QUANTITIES <br /> Sand and gravel layer purchased from 3rd party Topsoil purchased from 3rd party <br /> Layer thickness 6 inches Layer thickness 6 <br /> Quantity 14,400 tons Quantity 14,400 <br /> Cost per ton FOB $ 8.00 Cost per ton FOB $ 12.00 <br /> Subtotal cost $ 115,200.00 Subtotal cost $ 172,800.00 <br /> TRAVEL TIME <br /> Haul distance 2000 ft <br /> Total cycle time 10 minutes <br /> JOB TIME AND COST <br /> Fleet size: 2 trucks,1 loader, 1 dozer,1 water truck <br /> Total job time: 132.89 <br /> Fleet cost/hour 604.20 <br /> Total job cost: $ 80,292.36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.