My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-09_PERMIT FILE - M2021046 (6)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021046
>
2022-02-09_PERMIT FILE - M2021046 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:07 PM
Creation date
2/9/2022 3:01:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021046
IBM Index Class Name
Permit File
Doc Date
2/9/2022
Doc Name Note
Appendix M QAPP
Doc Name
Adequacy Review Response
From
Zephyr Gold USA Ltd
To
DRMS
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DGM Environmental Monitoring QAPP <br /> Section 10 CORRECTIVE ACTION — IMPROVEMENT REQUEST AND <br /> RESPONSE SYSTEM <br /> 10.1 Purpose of a Corrective Action — Continuous Improvement System <br /> The focus of this quality assurance program is quality. Quality_can only be maintained <br /> or improved if action is taken 1) to correct deficiencies when noted or 2) to improve the <br /> system or program when the potential for improvement is discovered. It is essential to <br /> this QA program that this process be documented. The Corrective Action - <br /> Improvement Request and Response (CAIR) System is the primary vehicle that this <br /> QAPP uses for formally initiating and documenting corrective actions and <br /> improvements. It is intended that this system be implemented upon approval of this <br /> QAPP and also be actively employed at the outset of any subsequent environmental <br /> related activities. <br /> The principle of continuous improvement is essential to contemporary QA philosophies. <br /> One purpose of the CAIR System is to promote continuous improvement. The <br /> philosophy of continuous improvement of quality requires that all Key Individuals be <br /> continuously on the lookout for ways to correct deficiencies in any system and improve <br /> their work product. The need for correction or improvement may be detected through <br /> personal involvement, observation, communication, formal evaluation, etc. The need for <br /> action may be evident as insufficient, inappropriate or incorrect data, improper <br /> conclusions or no conclusion possible, no work product or improper work product, <br /> inefficient or inadequate work systems, system failures, adequate work product with <br /> obvious need for improvement, or potentially dangerous circumstances. During normal <br /> quality assurance evaluations, the QAO may discover opportunities for improving <br /> quality more often than conditions in need of correction. In either case some action may <br /> be appropriate. These actions must be communicated to all parties involved. <br /> 10.2 Responsibilities and Duties <br /> Each work system participant is responsible for the credibility and quality of their work. <br /> Therefore, any Key Individual or their supervisor may initiate a request for CAIR. The <br /> QAO is responsible for coordinating corrective action or action requested for <br /> improvement by overseeing and maintaining the CAIR System. The QAO may <br /> determine the required level of involvement of supervisors and department head <br /> depending on type of action requested. He also informs the General Manager of <br /> requests, action taken, and significant findings of any follow-up. It is ultimately the <br /> General Manager's responsibility to assure that corrective action or action requested for <br /> improvements are accomplished expeditiously and that these actions alleviate any <br /> deficiencies when their need is recognized. <br /> 10.3 CAIR System Operation and Documentation <br /> The operating sequence of the CAIR begins when a need for action is detected. A <br /> CAIR request is documented and sent to the QAO. A responsible party is identified and <br /> Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.