My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-02-09_PERMIT FILE - M2021046 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021046
>
2022-02-09_PERMIT FILE - M2021046 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2022 4:05:07 PM
Creation date
2/9/2022 2:57:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021046
IBM Index Class Name
Permit File
Doc Date
2/9/2022
Doc Name Note
Appendix E AMEC 2016 Sub App F CQA
Doc Name
Adequacy Review Response
From
Zephyr Gold USA Ltd
To
DRMS
Email Name
TC1
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br /> foster <br /> wheeler <br /> Zephyr Gold USA Ltd. PAGE 3 OF 13 <br /> Dawson Gold Project <br /> Dawson Filtered Tailings Storage Facility SPECIFICATION SEC. NO.: <br /> 01400.2 <br /> Pre-feasibility Study TECHNICAL SPECIFICATIONS FOR DATE: (ORIGINAL) <br /> Fremont County, Colorado GEOSYNTHETICS CONSTRUCTION QUALITY 20-October-16 <br /> PROJECT NO.: 74201633 ASSURANCE(CQA) PLAN REVISION: A <br /> DATE: 20-Oct-16 <br /> 1.0 INTRODUCTION <br /> This plan addresses the construction quality assurance (CQA) procedures for the installation of the <br /> geosynthetic components of the Dawson Filtered Tailings Storage Facility (FTSF) at the Dawson Gold <br /> Project in Fremont County, Colorado. This CQA plan was prepared for the Pre-feasibility Study for the <br /> Dawson Filtered Tailings Storage Facility (FTSF). This plan is not intended for construction or bidding <br /> purposes. <br /> This CQA plan has been developed to assure that the construction of the geosynthetic components are in <br /> compliance with the project SPECIFICATIONS. The objective of this plan is to assure that proper materials, <br /> construction techniques, and procedures are utilized by the OWNER/CONTRACTOR and that the intent of <br /> the design is met. <br /> This plan addresses quality assurance (QA), and not quality control (QC). This CQA Plan is independent <br /> of any QC programs conducted by the INSTALLER. The intent of the CQA Plan is to provide verification <br /> and testing of construction materials and to demonstrate that the INSTALLER has met the requirements of <br /> the project DRAWINGS and SPECIFICATIONS. Quality control is provided by the INSTALLER and refers <br /> to those actions taken by the INSTALLER to ensure that materials and workmanship meet the requirements <br /> of the DRAWINGS and SPECIFICATIONS. <br /> 2.0 DESCRIPTION OF PARTIES <br /> The following Section provides descriptions of the parties to this CQA Plan including their responsibilities <br /> and qualifications. <br /> OWNER: In this CQA Plan, OWNER refers specifically to Zephyr Gold USA Ltd. (Zephyr). Zephyr is the <br /> OWNER and will operate the Dawson FTSF and other site features. <br /> MANAGER: In this CQA Plan, MANAGER is the official representative of the OWNER, appointed by the <br /> OWNER, and is responsible for all construction activities including oversight and direction during <br /> construction. MANAGER is also responsible for coordinating construction and CQA activities for the <br /> project. MANAGER, CQA MONITOR, and ENGINEER shall be responsible for the resolution of all CQA <br /> issues. <br /> Duties for this position include the following: <br /> • Review and approval of DRAWINGS and SPECIFICATIONS for all geosynthetic components of <br /> the Dawson FTSF construction and other site construction, as required. <br /> S:\ZEPHYR MINERALS\DRMS MINE APPLICATION\01400.2-GEOSYNTHETICS CQA.DOCX <br />
The URL can be used to link to this page
Your browser does not support the video tag.