Laserfiche WebLink
Hydrograph 10-yr Summary Project Name:Dawson Mine <br /> Hydrology Studio v 3.0.0.20 12-15-2021 <br /> Hyd. Hydrograph Hydrograph Peak Time to Hydrograph Inflow Maximum Maximum <br /> No. Type Name Flow Peak Volume Hyd(s) Elevation Storage <br /> (Cfs) (hrs) (Cult) (ft) (Cuft) <br /> 1 NRCS Runoff Basin All 26.82 12.12 100,021 ---- <br /> 2 NRCS Runoff BasinA2 17.37 12.15 71,428 ---- <br /> 3 Rational Pre Basin B 18.81 0.22 14,673 ---- <br /> 4 Rational Post Basin B 29.21 0.22 22,782 ---- <br /> 5 Rational Basin D1 25.73 0.10 9,263 ---- <br /> 6 Rational Pre Basin C 22.24 0.03 2,669 ---- <br /> 7 Rational Post Basin C 45.22 0.03 5,426 ---- <br /> 8 Rational Basin D4 5.724 0.22 4,465 ---- <br /> 9 Junction Basin A 43.85 12.13 171,449 1,2 <br /> 10 Rational Basin D2 21.32 0.20 15,354 ---- <br /> 11 Rational Basin D3 8.912 0.08 2,674 ---- <br /> 12 Junction Post Channel C 52.34 0.03 23,454 7,10,11 <br /> 13 Junction Pre Channel C 29.36 0.03 20,696 6,10,11 <br /> 14 Pond Route Pond 1 12.97 0.28 23,398 12 6276.74 12,641 <br /> 15 NRCS Runoff Basin E 81.29 12.37 523,043 ---- <br /> 16 Junction Road ACulvert 81.29 12.37 532,306 5,15 <br /> 17 Rational Pre Basin F 19.24 0.23 16,165 ---- <br /> 18 Rational Post Basin F 25.32 0.23 21,270 ---- <br /> B3 <br />