Laserfiche WebLink
Hydrograph by Return Period Project Name:Dawson Mine <br /> Hydrology Studio v 3.0.0.20 12-15-2021 <br /> Hyd. Hydrograph Hydrograph Peak Outflow(cfs) <br /> No. Type Name 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr <br /> 1 NRCS Runoff Basin Al 26.82 58.17 74.14 <br /> 2 NRCS Runoff BasinA2 17.37 37.93 48.44 <br /> 3 Rational Pre Basin B 18.81 23.79 25.97 <br /> 4 Rational Post Basin B 29.21 36.94 40.33 <br /> 5 Rational Basin D1 25.73 32.10 34.88 <br /> 6 Rational Pre Basin C 22.24 27.67 30.05 <br /> 7 Rational Post Basin C 45.22 56.26 61.10 <br /> 8 Rational Basin D4 5.724 7.240 7.903 <br /> 9 Junction Basin A 43.85 95.28 121.6 <br /> 10 Rational Basin D2 21.32 26.93 29.38 <br /> 11 Rational Basin D3 8.912 11.09 12.04 <br /> 12 Junction Post Channel C 52.34 65.18 70.81 <br /> 13 Junction Pre Channel C 29.36 36.59 39.76 <br /> 14 Pond Route Pond 1 12.97 15.75 16.87 <br /> 15 NRCS Runoff Basin E 81.29 180.4 231.6 <br /> 16 Junction Road ACulvert 81.29 180.4 231.6 <br /> 17 Rational Pre Basin F 19.24 24.38 26.62 <br /> 18 Rational Post Basin F 25.32 32.08 35.03 <br /> B2 <br />