Laserfiche WebLink
Material Kevs <br /> 1:Overburden <br /> 2:Sand and Gravel <br /> 300 <br /> 3:Weathered Bedrock <br /> 4:Stable Bedrock <br /> 280 <br /> 5:shiny wan <br /> 260 <br /> 240 <br /> 75 ft Offset to Canal Bank <br /> 220 <br /> c 2 m <br /> 200 � rn � <br /> - - — — — — — — — — — — — — — — — — — — — — — — <br /> - - <br /> 180 <br /> 160 <br /> 140 <br /> 120 <br /> 100 Analysis 1 <br /> Multiple Stability Analysis <br /> 80 Method: Bishop Simplified <br /> Surface: Circular <br /> 60 Results <br /> 100 150 200 250 300 350 400 450 Critical Factor of Safety: 3.85 <br /> GALENA version 7.2 Licensed to:J 8 T Consulting <br /> Edited: 2 Dec 2020 <br /> Proiect West Farm Pit Expansion Processed: 2 Dec 2020 <br /> Case 6-2 Full Reservoir <br /> � JaT ConsalrinR„Inc. <br /> File:C:\Galena Models\West Farm Expansion Case 6-2 Full Reservoir.gmf V <br />