Laserfiche WebLink
Material Keys <br /> 1:Overburden <br /> 300 2:Sand and Gravel <br /> 3:Weathered Bedrock <br /> 280 4:Stable Bedrock <br /> 5:Slurry Wall <br /> 260 <br /> 240 50 ft Offset to Cons Ease <br /> E <br /> 220 3 w <br /> C 7 CO <br /> 200 <n U <br /> 180 — — — — — — — _ _ _ _ _ <br /> 160 <br /> 140 <br /> 120 <br /> 100 <br /> Analysis 1 <br /> 80 Multiple Stability Analysis <br /> Method: Bishop Simplified <br /> Surface: Circular <br /> 60 <br /> Results <br /> 100 150 200 250 300 350 400 450 Critical Factor of Safety: 1.39 <br /> GALENA version 7.2 Licensed to:J&T Consulting <br /> Edited: 2 Dec 2020 <br /> Project West Farm Pit Expansion Processed: 2 Dec 2020 <br /> Case 6-1 Rapid Drawdown It� JsT Consulting,Inc. <br /> File:C:\Galena Models\West Farm Expansion Case 6-1 Rapid Drawdown.gmf V, <br />