Laserfiche WebLink
<br /> <br />the proposed future land use. <br />15. A reclamation cost estimate was not included in the reclamation plan. Please provide the costs <br />associated with each reclamation task. <br /> <br />6.3.5 Exhibit E Maps <br />16. Outline and label all major surface features to be used in connection with the proposed operation <br />specifically pit boundary, overburden and product stockpiles on the Mine Plan Map. <br />17. State the average thickness of replaced overburden on the Reclamation Plan Map. <br />18. A berm is noted on the Mine Plan Map. Please provide additional detail as to this berm, is it for <br />the Topsoil Stockpile or for another feature. <br /> <br />6.3.9 Exhibit I – Proof of Filing with County Clerk <br /> <br />19. A copy of the revised application needs to be placed on file with the local County Clerk and <br />Recorder. Please provide an affidavit or receipt indicated the date the revised application was placed with <br />the local Clerk and Recorder for public review. <br /> <br />6.3.10 Exhibit J Proof of Mailing Notices to the Board of County Commissioners and Conservation <br />District <br /> <br />20. Please provide proof that a revised notice of the correct permit application was sent to the Board <br />of County Commissioners and the Board of Supervisors of the local Conservation district. <br /> <br />6.3.12 Exhibit L Structure Agreements <br />The Applicant shall provide information sufficient to demonstrate that the stability of any structures <br />located within two hundred (200) feet of the operation or affected land will not be adversely affected. <br /> <br />21. Structure agreements for the four structures identified were not provided. <br /> <br />The application will not be considered submitted until the information listed above is received and found <br />sufficient to begin our review. A decision date will be established 15 days from the date of receipt of all <br />of the requested information. <br /> <br /> <br /> <br /> <br /> <br />You have sixty (60) days from the date of this letter (1 April 2022), to submit all necessary documents <br />the office needs for the application to be considered filed. If, at the end of the sixty day period, the <br />application has not been determined to be filed with the Office, the Office shall deny the application and <br />terminate the application file. <br /> <br />The response due date is 1 April 2022. <br /> <br />This letter shall not be construed to mean there are no other technical deficiencies in your application. <br />The Division will review your application to determine whether it is adequate to meet the requirements <br />of the Act after submittal of all required items. <br /> <br />Sincerely, <br /> <br />Robin Reilley M.S. GISP