My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-01-27_INSPECTION - C1981012
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981012
>
2022-01-27_INSPECTION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2022 8:11:28 AM
Creation date
1/28/2022 5:44:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Inspection
Doc Date
1/27/2022
Doc Name
Inspection Report
From
DRMS
To
New Elk Coal Company, LLC
Inspection Date
1/24/2022
Email Name
JLE
CJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 24,2022 C-1981-012/New Elk Mine JLE <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> Infraction Number: CV2021001 <br /> Inspection Date: October 13,2021 <br /> Date Issued: October 22,2021 <br /> Primary Topic: Roads <br /> Secondary Topic: <br /> Tertiary Topic: <br /> Description: Failure to describe the reconstruction of a light use road into a coal haul road to be <br /> constructed,used,or maintained within the permit area. Failure to provide specifications of the light use <br /> road reconstruction width,road gradient,road surface,road cut,fill embankment,culvert,bridge, <br /> drainage ditch,and drainage structure. Failure to provide plans and drawings for each haul road prepared <br /> by,or under the direction of,and certified by a qualified,registered professional engineer,experienced in <br /> the design and construction of roads. Failure to comply with performance standard requirements for haul <br /> roads. <br /> Abatement#: 1 <br /> Abatement Due Date: 10/22/2021 <br /> Abatement Due Extended Date: <br /> Abatement Date: <br /> Abatement Description: No additional construction and no coal hauling on the road pertaining to <br /> this violation may occur until the technical revision required by Abatement Step#2 has been approved <br /> and issued. <br /> Abatement#: 2 <br /> Abatement Due Date: 11/22/2021 <br /> Abatement Due Extended Date: <br /> Abatement Date: <br /> Abatement Description: Submit and receive approval of a technical revision to revise the road <br /> design for the light use road to comply with Rule 2.05.3(3)(c)and Rule 4.03.1 for the new haul road. <br /> The technical revision must be submitted on or before the abatement due date noted below. <br /> TR76 was submitted on October 26,2021. The application has been deemed incomplete. <br /> Number of Partial Inspection this Fiscal Year: 5 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.