ITEM 5.0 REVEGETATION OF ALL WORK AREAS,YEAR 1 <br /> Following grading and weed control measures, all disturbed areas shall be revegetated. This <br /> includes the reclaimed areas as well as any newly constructed access routes and areas where <br /> weeds have been eradicated. It is estimated that up to 9.0 acres of disturbance will need to be <br /> revegetated in Areas 1 and 2 shown on Figure 2. Areas will be revegetated according to the <br /> Revegetation Specifications, Section 20.0 in the General Bid Specifications, 2009. <br /> Application of materials must be accomplished in a manner that results in a consistent, complete, <br /> through and even distribution of seed, fertilizer and mulch to all ground surfaces. Revegetation <br /> methods will be used so as to not disturb existing vegetation established on site. CONTRACTOR <br /> must supply the laborer and equipment required to complete the task, fertilizer and mulch. <br /> PROJECT MANAGER will supply the seed. <br /> The following requirements apply to revegetation: <br /> Seed Distribution: The PROJECT MANAGER will provide the seed.An even distribution of <br /> seed over all disturbed areas is required. The seed shall be incorporated into the soil by raking or <br /> chain dragging then lightly compacted to provide good seed-soil contact. <br /> Fertilizer: Biosol Plus (7-2-1), or approved equivalent,will be added to all ground surfaces <br /> disturbed during reclamation construction. This material will be applied in advance of seeding at <br /> the rate of four hundred(400)pounds per acre. It is estimated that up to 3,600 pounds of Biosol <br /> Plus or approved equivalent fertilizer will be required. <br /> Mulch: Two (2)tons of certified weed free mulch per acre will be applied to the ground surface. <br /> It is estimated that up to 18 tons of mulch will be required. Mulch will be provided by <br /> CONTRACTOR and must be certified as noxious weed free or noxious weed seed free by an <br /> authorized State or County Officer. Documentation of certification must be provided to Project <br /> Manager prior to application of mulch. The mulch will be evenly distributed over the ground <br /> surface and crimped in by hand. Surface roughening will occur simultaneously with distribution <br /> of the weed free mulch in order to prevent loss of the mulch due to wind. <br /> Watering: No water will be applied to the revegetated areas. <br /> Measurement and Payment <br /> Payment for this item will be made at the unit price established in Item 5.0 of the Bid Schedule. <br /> Measurement for payment will be made to the nearest 0.1 acre of area revegetated. The price bid <br /> shall include all costs for labor, materials, equipment and all other items necessary for <br /> revegetation as described in this item. Such payment shall be considered full compensation for <br /> all labor, materials, equipment and all other items necessary and incidental to the completion of <br /> Item 5.0. <br /> Page 12 of 15 <br />