Laserfiche WebLink
r <br /> F <br /> HYDROLOGIC BALANCE -Rule 4.05 <br /> Drainage Control 4.05.1,4.05.2,4.05.3; Siltation Structures 4.05.5,4.05.6; Discharge Structures 4.05.7,4.05.10; <br /> Diversions 4.05.4;Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br /> Drainage —Acid and Toxic Materials 4.05.8;Impoundments 4.05.6,4.05.9; Stream Buffer Zones 4.05.18: <br /> The Final East Pit Ditch and North Trib,East Pit Ditch drainages were inspected.Due to snow cover,the actual <br /> ditches could not be observed. Overall,the drainages remain stable and no major erosion could be observed. <br /> The West Taylor Pond was inspected and stable.The pond currently hold water at the time of the inspection. <br /> The West Pit Pond was stable. The pond was snow covered but no visible water was observed. <br /> Section 25,Middle and Section 36 ponds were inspected. The three ponds run in series along the north eastern end <br /> of the Collom area. Each pond was snow covered but no issues were observed. <br /> vi <br /> GENERAL MINE PLAN COMPLIANCE: <br /> Active shovel operations were observed within the Collom Pit along the Collom Gulch drainage.No other activing <br /> mining operations was observed at the Collom Pit. <br />