Laserfiche WebLink
10 January 2022 C-1994-082/Yoast Mine RAR <br /> HYDROLOGIC BALANCE-Rule 4.05 <br /> General Requirements 4.05.1; Effluent Standards 4.05.2; Divergence and Conveyance of Overland <br /> Flow 4.05.3;Diversions 4.05.4; Sediment Control Measures 4.05.5, 4.05.6; Discharge Structures 4.05.7; <br /> Impoundments 4.05.9; Ground Water Monitoring 4.05.13; Underground Mine Entry 4.05.10; Surface and <br /> Ground Water Monitoring 4.05.13;Stream Buffer Zones 4.05.18: <br /> o Reconstructed drainages appeared to be functioning adequately. <br /> o No pond discharge was noted in the imagery, and no flow in constructed drainages was evident. <br /> o Ponds were frozen and snow covered. <br /> SLIDES and OTHER DAMAGE-Rule 4.12 <br /> o The site,in the past,has experienced soil movement in the form of slumps and slides. At the time of <br /> inspection no evidence of recent new movement is apparent and historic slide areas appear stable. <br /> o Historic slumping above Pond 13 appeared stable in the imagery. <br /> REVEGETATION-Rule 4.15 <br /> General Requirements 4.15.1. <br /> o Revegetation appeared to be adequately established, and at this time of year was dormant. <br /> DOCUMENTS RECEIVED <br /> None <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> PHOTOGRAPHS <br /> g=� <br /> r <br /> Photo 1: Overview of reclamation. <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 3 of 5 <br />