My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-29_PERMIT FILE - M2021009 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021009
>
2021-12-29_PERMIT FILE - M2021009 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2025 2:57:56 AM
Creation date
12/29/2021 12:27:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021009
IBM Index Class Name
Permit File
Doc Date
12/29/2021
Doc Name Note
Appendix 8 - Preliminary SPCC Plan
Doc Name
Adequacy Review Response
From
Lewicki & Associates/Young Ranch Resource, LLC
To
DRMS
Email Name
AME
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3-3: Fuel Transfer Procedures <br /> Stage Tasks <br /> Prior to loading/ ❑ Visually check all hoses for leaks and wet spots. <br /> unloading ❑ Verify that sufficient volume(ullage)is available in the storage tank or truck. <br /> ❑ Secure the tank vehicle with wheel chocks and interlocks. <br /> ❑ Ensure that the vehicle's parking brakes are set. <br /> ❑ Verify proper alignment of valves and proper functioning of the pumping system. <br /> During loading/ ❑ Driver must stay with the vehicle at all times during loading/unloading activities. <br /> ❑ Periodically inspect all systems,hoses and connections. <br /> unloading ❑ When loading, keep internal and external valves on the receiving tank open along <br /> with the pressure relief valves. <br /> ❑ When making a connection,shut off the vehicle engine.When transferring Class 3 <br /> materials,shut off the vehicle engine unless it is used to operate a pump. <br /> ❑ Monitor the liquid level in the receiving tank to prevent overflow. <br /> ❑ Monitor flow meters to determine rate of flow. <br /> ❑ When topping off the tank, reduce flow rate to prevent overflow. <br /> After loading/ ❑ Make sure the transfer operation is completed. <br /> unloading ❑ Close all tank and loading valves before disconnecting. <br /> ❑ Securely close all vehicle internal,external,and dome cover valves before <br /> disconnecting. <br /> ❑ Make sure the hoses are drained to remove the remaining oil before moving them <br /> away from the connection. Use a drip pan. <br /> ❑ Cap the end of the hose and other connecting devices before moving them to <br /> prevent uncontrolled leakage. <br /> SPCC— YRR 24 Lcwicki&Associates <br /> Date, YEAR <br />
The URL can be used to link to this page
Your browser does not support the video tag.