Laserfiche WebLink
Table 1-2: SPCC Plan Cross-Reference with CFR <br /> Provision Plan Section Page <br /> 112.3(d) Professional Engineer Certification 4 <br /> 112.3(c) Location of SPCC Plan 5 <br /> 112.5 Plan Review 5 <br /> 112.7 Management Approval 3 <br /> 112.7 Cross-Reference with SPCC Rule 8 <br /> 112.7(a)(3) Site Plan and Facility Diagram 12 and Appendix A <br /> 112.7(a)(4) Spill/Discharge Notification 40 <br /> 112.7(a)(5) Part 5: Discharge Response 34 <br /> 112.7(b) 3.4 Potential Discharge Volumes and 12 <br /> Direction of Flow <br /> 112.7(c) 3.5 Containment and Diversionary 14 <br /> Structures <br /> 112.7(d) 3.6 Practicability of Secondary 14 <br /> Containment <br /> 112.7(e) 3.7 Inspections,Tests,and Records 14 <br /> 112.7(f) 3.8 Personnel,Training and Discharge 21 <br /> Prevention Procedures <br /> 112.7(g) 3.9 Security 23 <br /> 112.7(h) 3.10 Tank Truck Loading/Unloading 23 <br /> 112.7(i) 3.11 Brittle Fracture Evaluation 25 <br /> 112.7(j) 3.12 Conformance with Applicable State 25 <br /> and Local Requirements <br /> 112.8(b) 4.1 Facility Drainage 26 <br /> 112.8(c)(1) 4.2.1 Construction 28 <br /> 112.8(c)(2) 4.2.2 Secondary Containment 28 <br /> 112.8(c)(3) 4.2.3 Drainage of Diked Areas 28 <br /> 112.8(c)(4) 4.2.4 Corrosion Protection 28 <br /> 112.8(c)(6) 4.2.6 Inspection- Facility Inspection 28 <br /> Checklists <br /> 112.8(c)(8) 4.2.8 Overfill Prevention System 32 <br /> 112.8(c)(10) 4.2.10 Visible Discharges 32 <br /> 112.8(c)(11) 4.2.11 Mobile and Portable Containers 32 <br /> 112.8(d) 4.3 Transfer Operations, Pumping and In- 32 <br /> Plant Processes <br /> 112.20(e) Certification of Substantial Harm 42 <br /> Determination <br /> SPCC- YRR 8 Q Lewicki&Associates <br /> Date, YEAR <br />