Laserfiche WebLink
Table 11. Reclamation Task and Cost Estimate <br /> Activity Description Time(Months) Cost($) <br /> Mobilization<45 mile 1 20,000.00 <br /> Highwall backfilling and grading 3 23,200.00 <br /> WRL knockdown and grading .S 3,466.00 <br /> Place Topsoil 1 43,197.00 <br /> Revegetation of disturbed areas to dry rangeland 1 34,932.00 <br /> Revegetation of disturbed areas to forested 1 22,776.00 <br /> Subtotal 7.5 $147,571.00 <br /> CDRMS Costs(28%x direct costs) $41,319.88 <br /> Final Reclamation Bond Amount $188,890.88 <br /> The final reclamation bond amount should be set at $188,891.00. <br /> Young Ranch Resource <br /> December 2021 L-3 Lewicki&Associates <br />