My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-29_PERMIT FILE - M2021009 (16)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021009
>
2021-12-29_PERMIT FILE - M2021009 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2024 6:30:01 AM
Creation date
12/29/2021 11:22:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021009
IBM Index Class Name
Permit File
Doc Date
12/29/2021
Doc Name Note
Exhibit L - Reclamation Costs
Doc Name
Adequacy Review Response
From
Lewicki & Associates/Young Ranch Resource, LLC
To
DRMS
Email Name
AME
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following reclamation tasks will be required: <br /> • Mobilization of equipment<45 miles = $20,000.00. <br /> • Active highwall backfilling, grading, and small boulder resurfacing: 500 feet of roughly <br /> I.OH:0.5V slope will be backfilled along the 50-foot-wide bench at depths required to <br /> create a 2.OH:LOV slope at a final height of 25 feet. 11,600 CY of backfilled material at <br /> $2.00/CY= $23,200.00. <br /> • Knock-down and grading of the final/active dump lift and the lift below of the eastern <br /> dump: 300 feet of roughly LOH:LOV slope knocked down and covered with coarse <br /> blasted rock along the two 50-foot-tall lift to create a 2.2H:LOV final slope, 3,466 CY of <br /> knocked down material at $.50/CY= $1,733.00 * 2 lifts= $3,466.00. <br /> • Plant growth medium (i.e., growth medium and amended fines, etc.) surfacing = 35.7 <br /> acres at 6 inches deep = 28,798 CY at $1.50/CY= $43,197.00. <br /> • Dry rangeland revegetation and mulching of the 28.4 acres `flat' disturbed areas. <br /> $820/acre native dry rangeland seed mix *1.5 to account for 50% failure rate= <br /> $34,932.00. <br /> • Forest shrub seed mix of the 6.5-acre backfilled highwall and 0.8-acre WRL slope. <br /> $1000/acre forest shrub seed mix doubled to account for 100% failure rate = $14,600.00. <br /> • Tree tubelings at a 140 trees/acre of the 6.5-acre backfilled highwall and 0.8-acre active <br /> WRL lift slope. Each tree will cost—$2 with an additional $2 planting cost totaling to <br /> $4/tree tubeling or approximately $4,088.00. This number is then doubled to $8,176.00 to <br /> account for 100% failure rate. <br /> Young Ranch Resource <br /> December 2021 L-2 Lewicki& Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.