Laserfiche WebLink
Table 5. Example Native Dry Rangeland Seed Mix <br /> Seed Mix#1: South/West-Facing Slopes <br /> Scientific Name Common Name %of Mix LBS/PLS Required <br /> Achiliea millefolium Western yarrow 5 0.1 <br /> Achnotherum hymenoides Indian ricegrass 5 2.0 <br /> Bouteloua gracilis Blue grama 10 0.9 <br /> Bromus morginatus Mountain brome 5 5.1 <br /> Elymus elymoides Bottlebrush squirreltail 10 3.4 <br /> Elymus lanceolatus Thickspike wheatgrass 10 4.2 <br /> Eragrostis trichodes Sand lovegrass 5 0.2 <br /> Koeleria macrantha Prairie junegrass 5 0.1 <br /> Linum lewisii Blue flax 5 1.9 <br /> Nossella viridula Green needlegrass 5 1.9 <br /> Poscopyrum smithii Western wheatgrass 10 5.7 <br /> Poo secundo Sandberg bluegrass 5 0.3 <br /> Pseudoroegneria spicata Bluebunch wheatgrass 10 5.2 <br /> Schizachyrium scoporium Little bluestem 5 1.4 <br /> Sorghastrum nutans Yellow Indiangrass 5 1.9 <br /> Total: 100 34.3 <br /> Notes: <br /> Quantity assumes 150 seeds per square foot broadcast seeded. Reduce by 25%for drill seeding. <br /> Quantity based on 1.0 acres of seeding(adjust according to required acreage). <br /> Final species composition and rates subject to availability. <br /> A final native dry rangeland seed mix and application rates will be verified by a contracted <br /> revegetation consultant. <br /> 6.4.5(2)(e) <br /> Reclamation will be performed within a year of an area being fully mined, in order to minimize <br /> liability and to keep the financial warranty lower. Seeding and planting will take place during the <br /> fall following application of growth medium on reclamation slopes. <br /> See Table 1 for a description of size (acreage) and timing of each phase. <br /> Reclamation will take place concurrently with mining with an additional estimated 6 months of <br /> final reclamation construction required after mining is completed. For example, Phase 1 is <br /> Young Ranch Resource <br /> December 2021 E-7 Le.vicki&Associates <br />