Laserfiche WebLink
dDivision <br />cOLORADO <br />of Reclamation. <br />Mining and Safety <br />department of Natural Resources <br />MINERALS PROGRAM INSPECTION REPORT <br />PHONE: (303) 866-3567 <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />MINE NAME: <br />MINE/PROSPECTING ID#: <br />MINERAL: <br />COUNTY: <br />Front Range Feedlot Borrow 2 <br />M-2018-011 <br />Sand and gravel <br />Weld <br />INSPECTION TYPE: <br />INSPECTOR(S): <br />INSP. DATE: <br />INSP. TIME: <br />Monitoring <br />Eric Scott <br />December 8, 2021 <br />15:00 <br />OPERATOR: <br />OPERATOR REPRESENTATIVE: <br />TYPE OF OPERATION: <br />Ames Construction, Inc. <br />Mike Volosin <br />I I I - Construction by Goverment Agency <br />REASON FOR INSPECTION: <br />Normal I&E Program <br />BOND CALCULATION TYPE: <br />None <br />BOND AMOUNT: <br />$51,014.00 <br />DATE OF COMPLAINT: <br />POST INSP. CONTACTS: <br />JOINT INSP. AGENCY: <br />NA <br />None <br />None <br />WEATHER: <br />INSPECTOR'S SIGNATURE: <br />SIGNATURE DATE: <br />Clear <br />December 17, 2021 <br />The followiniz inspection tonics were identified as haviniz Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Reclamation Success <br />PROBLEM/POSSIBLE VIOLATION: Problem: Failure to follow approved reclamation plan, or current reclamation <br />plan needs to be updated and clarified pursuant to C.R.S. 34-32.5-116 (1). The operator must follow approved <br />reclamation plan or provide sufficient information to describe or identify how the operator intends to conduct <br />reclamation. Reveeetation efforts will need to be restarted and properly maintained so site can be released <br />within statutory timeframe - within 5 years of end of mining. The operator must follow approved reclamation <br />plan or provide sufficient information to describe or identify how the operator intends to conduct reclamation. <br />CORRECTIVE ACTIONS: The operator shall submit a Technical Revision. with the reauired S216 revision fee. to <br />update and clarifv the current approved reclamation plan. to reflect existine and proposed activities by the <br />corrective action date. The provided TR must include an enforceable timeline for required work to achieve final <br />reclamation within the 5 year statutory timeframe - i.e. site fencing, soil amendment, seed and mulch as <br />needed. <br />CORRECTIVE ACTION DUE DATE: 2/25/22 <br />Page 1 of 4 <br />