Laserfiche WebLink
December 8, 2021 C-1981-019/Colowyo Coal Mine ZTT <br /> Section 25 Pond. <br /> GENERAL MINE PLAN COMPLIANCE: <br /> The highwall miner was active at the time of the inspection.The miner had just begun a new cut into the coal <br /> seam.Additional preparation for future highwall mining was occurring within the Collom Gulch which included <br /> benching and grading. <br /> Highwall miner. <br /> SIGNS AND MARKERS—Rule 4.02: <br /> Mine identification signs were inspected and observed at Colowyo's primary entrance along State Highway 13 and <br /> the security building as well as Highway 13 and access road to the Section 28 pond.All information required for <br /> compliance was observed. <br /> Number of Partial Inspection this Fiscal Year: 3 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 5 of 8 <br />