My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-07_REVISION - M2012032 (18)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-12-07_REVISION - M2012032 (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:13:38 AM
Creation date
12/7/2021 11:02:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
12/7/2021
Doc Name Note
Appendix 2: SWMP
Doc Name
Proposed Revision Materials
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DURAY SILVER MrvEs <br /> staging area for work underground. All facilities at Revenue are constructed within disturbance <br /> areas that have runoff control systems. <br /> FUEL STORAGE <br /> Various oil containing tanks and drums are stored at the Revenue Mine. All of these tanks have <br /> secondary containment either through structures directly surrounding the tanks or a portable <br /> spill pallet. <br /> The capacities of the oil containers present at the site are listed below and indicated on the <br /> facility diagram. All containers with a capacity of 55 gallons or more are included. Drum <br /> quantities will vary based on consumption. Additional information about fuel management may <br /> be found in the Spill Prevention, Control and Countermeasures Plan for the Site. <br /> Hydrocarbon & Reagent containers. <br /> Container ID Secondary Containment <br /> C-1-Tank (10,000 gal diesel, 1,000 gal unleaded) double walled tanks <br /> Fuel <br /> Surface—near admin building <br /> C-3 - Materials Storage Warehouse (55 gal drums) Spill pallets and welded steel <br /> containment <br /> Various Oils/Lubricants <br /> Surface- near thickener tank <br /> C-4-Waste Storage Pad (55 gal drums) spill pallets <br /> Used Oil <br /> Surface—near underground maintenance shop <br /> C-5 - Backup Generator (500 gal) double walled tank <br /> Diesel <br /> Mobile-near mill building <br /> C-6 Loci Barn Underground (55 gal drums) spill pallets <br /> Rock drill oil <br /> Underground -Viginius South near decline <br /> C-7 Underground Shop (55 gal drums) spill pallets <br /> Various oils/Lubricants <br /> Underground - between portal and mill <br /> C-8 Reagent Room (Various size tanks 12,730 gal total) concrete floor with vertical curbs <br /> Designated Chemicals(Mill Chemicals) <br /> Surface-attached to mill building <br /> C-9 Tank (10,000 gal diesel) Double walled tank <br /> Fuel <br /> Surface—near mill building <br /> C-10 1800 Level (55 gal drums) spill pallets <br /> Rock drill oil <br /> Underground on 1800 level <br /> Stormwater Management Plan 5 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.