My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-07_REVISION - M2012032 (16)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-12-07_REVISION - M2012032 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:13:38 AM
Creation date
12/7/2021 11:02:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
12/7/2021
Doc Name Note
Appendix 1 - SPCC, ERP, and MCP
Doc Name
Proposed Revision Materials
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DLRAY SILVER MIKES <br /> 1.3 Location of SPCC Plan (40 CFR 112.3(e)) <br /> In accordance with 40 CFR 112.3(e), a complete copy of this Plan is maintained in the <br /> Administration Building and in the Control Room of the Mill Building. The Administration <br /> Building is accessible during regular business hours. The Mill Building is accessible at all times <br /> whenever the facility is operating. <br /> 1.4 Plan Review (40 CFR 112.3 and 112.5) <br /> 1.4.1 Changes in Facility Configuration <br /> In accordance with 40 CFR 112.5(a), OSMI periodically reviews and evaluates this Plan for any <br /> changes in facility design, construction, operation or maintenance that materially affects the <br /> facility's spill potential, including but not limited to: <br /> • Reconstruction, replacement or installation of piping systems; <br /> Construction or demolition that might alter secondary containment structures; or <br /> • Changes of product/service, revisions to standard operation, modification of <br /> testing/inspection procedures and the use of new or modified industry standards or <br /> maintenance procedures. <br /> Amendments to the Plan made to address changes of this nature are referred to as "technical <br /> amendments" and must be certified by a registered Professional Engineer. <br /> Non-technical amendments can be performed and must be documented by the facility owner <br /> and/or operator. Non-technical amendments include the following: <br /> • Change in the name or contact information (i.e. telephone numbers) of individuals <br /> responsible for implantation of this Plan; or <br /> Change in the name or contact information of spill response/cleanup personnel or <br /> contractors. <br /> OSMI must make the needed technical or non-technical amendments to the Plan as soon as <br /> possible but no later than 6 months from the date of the amendment. The Site Manager is <br /> responsible for initiating and coordinating amendments to the Plan. <br /> 1.4.2 Scheduled Plan Reviews <br /> In accordance with 40 CFR 112.5(b), OSMI reviews this Plan at least once every 5 years. <br /> Revisions to the Plan, if needed, are made within 6 months of the 5-year review. A registered <br /> Profession Engineer certifies any technical amendment to the Plan in accordance with 40 CFR <br /> 112.3(d). <br /> Spill Prevention Control and Countermeasure Plan 8 1 P a Q e <br />
The URL can be used to link to this page
Your browser does not support the video tag.