Laserfiche WebLink
OURAY SILVER,ti?INES <br /> 1.4.3 Record of Plan Reviews <br /> Scheduled reviews and Plan amendments are recorded in the Plan Review Log located in <br /> Appendix B. This log must be completed even if no amendment is made to the Plan as a result <br /> of the review. Unless a technical or administrative amendment prompts an earlier review, the <br /> next scheduled review of this Plan'must occur by November, 2023. <br /> 1.5 Facilities, Procedures, Methods or Equipment Not Yet Fully Operational (40 CFR 112.7) <br /> The bulk storage containers at this facility had not been used prior to installation. In this <br /> condition,the containers do not require integrity testing for 15 years. Section 4.2.6 of this Plan <br /> describes the inspection program to be implemented following a regular schedule, including the <br /> dates by which each of the bulk storage containers must be tested. <br /> 1.6 Cross-Reference with SPCC Provisions (40 CFR 112.7) <br /> This Plan does not follow the exact order presented in 40 CFR part 112. Section headings <br /> identify, where appropriate, the relevant section(s) of the SPCC rule. Table 1.1 presents a cross- <br /> reference of the Plan sections relative to applicable parts of 40 CFR part 112. <br /> Spill Prevention Control and Countermeasure Plan 9 1 P a a e <br />