My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-07_REVISION - M2012032 (16)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-12-07_REVISION - M2012032 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:13:38 AM
Creation date
12/7/2021 11:02:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
12/7/2021
Doc Name Note
Appendix 1 - SPCC, ERP, and MCP
Doc Name
Proposed Revision Materials
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
outside the Filter Building is the alternative assembly area if the primary <br /> assembly points are inaccessible. <br /> - Mobilization: Basic PPE Requirements <br /> All personnel reporting for Stage 2 response operations will first don hard <br /> hats, safety glasses, and steel-toed safety shoes. This is the minimum personnel <br /> protective equipment (PPE) required during response operations. EFR <br /> personnel who are not wearing the minimum PPE listed above will be <br /> restricted to support functions only during Stage 2 operations. <br /> - Mobilization: Mine Foreman (Emergency Coordinator EC) <br /> o Provide an initial situation report to all response personnel at the primary <br /> assembly point. <br /> o Review the incident evaluation, determine a preliminary course of action, <br /> and delegate specific duties to response personnel. <br /> o Establish an incident command post at a secure location near the incident <br /> location. <br /> o Establish a site command post with secure communication links to off-site <br /> entities at a location unaffected by the incident and ensure that <br /> communications with the incident command post and off-site entities are <br /> functional. <br /> o Organize response personnel for deployment based upon the initial situation <br /> report and the projected course of action. Response organization will include <br /> the delineation of responsibilities or duties; the provision of proper PPE; the <br /> collection of specialized equipment; and the establishment of a support base, <br /> including communications. <br /> o Establish a preliminary field response plan based upon the initial situation <br /> report and the projected course of action. <br /> 2.2.3 Stage 2 Field Action <br /> A Stage 2 Field Action is a coordinated field response to an emergency situation by multiple <br /> Revenue Mine May 2021 Rule 8-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.