My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-07_REVISION - M2012032 (16)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-12-07_REVISION - M2012032 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:13:38 AM
Creation date
12/7/2021 11:02:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
12/7/2021
Doc Name Note
Appendix 1 - SPCC, ERP, and MCP
Doc Name
Proposed Revision Materials
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
situation from a safe distanceuntil help arrives if the initial incident evaluation, or the <br /> responder's ongoing evaluation, indicates that an unwarranted hazard exists or may <br /> develop. <br /> 2_2 Stage 2 Operations -Multiple Responder <br /> Stage 2 response operations are coordinated site-wide operations involving multiple <br /> personnel. Stage 2 response operations are initiated during the notification phase of any <br /> emergency responseand proceed through the three distinct Stage 2 activity phases of Alert, <br /> Mobilization, and Field Actions. <br /> 2.2.1 Stage 2 Alert <br /> Sounding of the Emergency Alarm Horn (Fire Alarm) during the Notification Phase <br /> of an emergency situation constitutes the Alert phase of a Stage 2 response operation <br /> and signals the beginning of a Stage 2 site response. All EFR and non-EFR personnel <br /> on the surface areto immediately proceed to a designated assembly point when the <br /> Emergency Alarm Horn (Fire Alarm) is sounded. <br /> 2.2.2 Stage 2 Mobilization <br /> All emergency responses to an emergency situation at the Revenue Mine will <br /> continue through Stage 2.Mobilization. Mobilization for Stage 2 response operations <br /> consists of the assembly and organization of site surface personnel for coordinated <br /> response operations andwill terminate at the end of mobilization if the emergency <br /> situation is successfully resolved at the First Responder level. The site will <br /> demobilize and the Remediation Phase of the Emergency Response Plan will be <br /> executed if the situation is resolved at the First Responder level. <br /> - Mobilization: Assembly <br /> All surface personnel are required to report to a designated assembly point <br /> when thealert signal is sounded. The primary assembly point for EFR <br /> personnel during a surface emergency situation is the Fire Alarm Control <br /> Panel located on the outside wall of the mine office. The primary assembly <br /> point for non-EFR personnel is the area outside the mine portal. The area <br /> Revenue Mine May 2021 Rule 8-10 <br />