My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-07_REVISION - M2012032 (16)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-12-07_REVISION - M2012032 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:13:38 AM
Creation date
12/7/2021 11:02:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
12/7/2021
Doc Name Note
Appendix 1 - SPCC, ERP, and MCP
Doc Name
Proposed Revision Materials
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> OURAY SILVER MINES <br /> Introduction <br /> The purpose of this Spill Prevention Control and Countermeasure (SPCC) Plan is to describe the <br /> measures implemented by Ouray Silver Mines Inc. (OSMI)to prevent discharges of <br /> hydrocarbons from occurring and to mitigate the impacts of a discharge. <br /> In addition to oils and fuels, this Plan should also apply to all chemical management on site. <br /> Chemicals stored in the facility will be referenced in the Material Containment Plan (MCP). <br /> This Plan has been prepared to meet the requirements of Title 40 CFR, Code of Federal <br /> Regulations, Part 112 (40 CFR part 112). <br /> This Plan provides guidance on key actions that OSMI must perform to comply with the SPCC <br /> rule: <br /> Complete site inspections as outlined in Section 3.7 of this Plan; <br /> * Perform preventative maintenance of equipment, secondary containment systems and <br /> discharge prevention systems as needed to maintain proper operational condition; <br /> • Conduct annual employee training as outlined in Section 3.8 of this Plan and maintain a <br /> current training log; <br /> Review the SPCC Plan at least once every 5 years and amend the Plan to include other <br /> prevention and control technology if such technology will significantly reduce the <br /> likelihood of a spill event and has been proven effective in the field at the time of the <br /> review. Amend the SPCC plan within 6 months whenever there is a change in facility <br /> design, construction, operation or maintenance that materially affects the facility's spill <br /> potential. The revised Plan must be recertified by a Professional Engineer on the <br /> certification page in section 1.2 of this Plan; <br /> • Administrative changes must be documented in the Plan review log but do not have to <br /> be certified by a Professional Engineer; and <br /> o If either of the following occurs, submit the SPCC Plan to the EPA Region 8 Regional <br /> Administrator (RA) and the Colorado Department of Health and Environment (CDPHE) <br /> along with other information as detailed in Section 5 of this Plan: <br /> o The facility discharges more than 1,000 gallons of hydrocarbons into or upon the <br /> Waters of the U.S. (Sneffels Creek) or adjoining shorelines in a single spill event; <br /> or <br /> o The facility discharges oil in a quantity greater than 42 gallons in each of two spill <br /> events within any 12 month period. <br /> Spill Prevention Control and Countermeasure Plan 3 1 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.