My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-07_REVISION - M2012032 (16)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-12-07_REVISION - M2012032 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:13:38 AM
Creation date
12/7/2021 11:02:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
12/7/2021
Doc Name Note
Appendix 1 - SPCC, ERP, and MCP
Doc Name
Proposed Revision Materials
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GUF aY SLV Eu MIMES <br /> Table of Contents <br /> Page <br /> Introduction 3 <br /> Part 1 Plan Administration 5 <br /> 1.1 Management Approval and Designated Person 5 <br /> 1.2 Professional Engineer Certification 6 <br /> 1.3 Location of SPCC Plan 8 <br /> 1.4 Plan Review 8 <br /> 1.5 Facilities, Procedures, Methods or Equipment Not Yet fully Operational 9 <br /> 1.6 Cross-Reference with SPCC Provisions (40 CFR) 9 <br /> Part 2 General Facility Information 11 <br /> 2.1 Facility Description 11 <br /> 2.2 Evaluation of Discharge Potential 13 <br /> Part 3 Discharge Prevention - General SPCC Provisions 14 <br /> 3.1 Compliance With Applicable Requirements 14 <br /> 3.2 Spill Reporting 14 <br /> 3.3 Potential Discharge Volumes and Direction of Flow 14 <br /> 3.4 Containment and diversionary Structures 15 <br /> 3.5 Practicality of Secondary Containment 15 <br /> 3.6 Inspections, Tests and Record 15 <br /> 3.7 Personnel, Training and Discharge Prevention Procedures 18 <br /> 3.8 Security 18 <br /> 3.9 Tank Truck Loading/Unloading Rack Requirements 18 <br /> 3.10 Brittle Facture Evaluation 20 <br /> 3.11 Conformance with State and Local Applicable Requirements 20 <br /> Part 4 Discharge Prevention -SPCC Provisions for Onshore Facilities (Excluding <br /> Production Facilities) 21 <br /> 4.1 Facility Drainage 21 <br /> 4.2 Bulk Storage Containers 21 <br /> 4.3 Transfer Operations, Pumping and In-plant Processes 25 <br /> Part 5 Discharge Response 26 <br /> 5.1 Minor Spill Response 26 <br /> 5.2 Major Spill Response 27 <br /> 5.3 Waste Disposal 28 <br /> 5.4 Spill Notification Forms and Discharge Notification 28 <br /> Appendix A Spill Reporting/Documentation and Contact Information <br /> Appendix B Logs and SPCC Map <br /> Appendix C Tank Shell Test Protocol <br /> Spill Prevention Control and Countermeasure Plan 2 1 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.