My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-07_REVISION - M2012032 (16)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-12-07_REVISION - M2012032 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:13:38 AM
Creation date
12/7/2021 11:02:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
12/7/2021
Doc Name Note
Appendix 1 - SPCC, ERP, and MCP
Doc Name
Proposed Revision Materials
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OURAY SILVER IWI NES <br /> OSMI management has instructed hydrocarbon handling personnel in the operation and <br /> maintenance of pollution prevention equipment, discharge procedure protocols, applicable <br /> pollution control laws, rules and regulations, general facility operations and the content of this <br /> SPCC Plan. Any new personnel with handling responsibilities are provided with this same <br /> training prior to being involved in any operation. This is provided during initial employee <br /> induction training and training logs are kept. <br /> Annual discharge prevention briefings are held during Annual Refresher Training for all facility <br /> personnel. Those personnel involved in operations will receive additional training that is <br /> focused on adherence to the discharge prevention measures presented in this Plan. The <br /> training will include known discharge events and maintenance conducted. During training <br /> sessions, facility operators will have the opportunity to share suggestions concerning health, <br /> safety and environmental issues encountered during facility operations. <br /> 3.8 Security (40 CFR 112.7(g)) <br /> Access to the facility is gated and locked. The site's topography acts as a natural barrier to <br /> trespassing. <br /> 3.9 Tank-Truck Loading/Unloading Rack Requirements (40 CFR 112.7(h)) <br /> All fuel products on site are supplied by mobile fuel trucks brought on site periodically. As fuel <br /> and reagents present the main potential for a discharge, OSMI management is committed to <br /> ensuring the safe transfer of these products. <br /> 3.9.1 Secondary Containment (40 CFR 112.7(h)(1)) <br /> Product delivery will be by trucks with secondary containment. There is also a collection ditch <br /> that partially protects the site from a discharge. Transfer of fuel to an AST takes place adjacent <br /> to the surface facilities. Reagent transfer from shipping containers for dilutions and use occurs <br /> entirely within secondary containment. <br /> 3.9.2 Loading/Unloading Procedures (40 CFR 112.7(h)(2)&(3)) <br /> Vehicle and site equipment filling operations are conducted by facility personnel trained in <br /> proper discharge prevention procedures.The equipment operator or other facility personnel <br /> remain with the equipment while fuel is being transferred. Transfer operations are performed <br /> according to the procedures outlined in Table 3.3. This table is posted at all loading/unloading <br /> locations. <br /> Spill Prevention Control and Countermeasure Plan 181 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.