My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-07_REVISION - M2012032 (24)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-12-07_REVISION - M2012032 (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:13:38 AM
Creation date
12/7/2021 10:59:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
12/7/2021
Doc Name Note
Exhibit U: Designated Mining Operation Environmental Protection Plan
Doc Name
Proposed Revision Materials
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 Facilities Evaluation <br /> EPFs and other facilities are effective at controlling designated chemicals and acid generating <br /> materials. <br /> The EPF (i.e., new Reagent Room) discussed in this EPP is shown in the attached Figure U-1, <br /> and a list of reagents stored on site is provided in Table U-2. The Reagent Room is designed to <br /> contain 100% of the maximum amount of the reagents stored. In addition to the Reagent Room, <br /> several other facilities throughout the site operate to control and contain chemicals and materials. <br /> Total containment for the on-site facilities is provided in Table U-3, which demonstrates <br /> adequate containment of the 10-year 24-hour storm event per Rule 7.3.1(3). <br /> Tailings from milling operations will be stored permanently on site in one of two TSFs as <br /> described in Exhibit D. These facilities will contain a blend of tailings and waste rock and will be <br /> reclaimed in place once mining and processing is complete. <br /> Waste rock generated from development mining and mining of ore will be permanently placed as <br /> backfill in the mined-out stopes or used to blend with tailings as part of the final design of the <br /> TSFs. Waste rock also will be tested and crushed for use as road base on and off site. A copy of <br /> the most recent analysis of waste rock is provided in Appendix 7. <br /> 6.1 TSF BMPs <br /> To effectively control the tailings placed in the TSFs, the following best management practices <br /> are followed. <br /> - Runoff from the undisturbed south hillside is diverted away from the TSF embankment, <br /> using diversion ditches designed for the 10-yr, 24-hr storm event. <br /> - TSFs and waste rock embankments will be capped with a minimum of 6 inches of topsoil <br /> and planted with a stable mix of native grasses and forbs per Exhibit E. The vegetation is <br /> expected to minimize erosion and will absorb most of the direct precipitation and surface <br /> water runoff that occurs on the reclaimed embankment. This will minimize the amount of <br /> water that can percolate into the reclaimed waste material. Details of this plan are shown <br /> in Exhibit E. <br /> - The gradual slopes and revegetated surface of the waste rock embankment will minimize <br /> erosion of topsoil and prevent exposure of the underlying waste rock. <br /> - The permeability of the waste rock is reduced by the compaction that is specified (94% of <br /> maximum dry density) of the waste pile. The material is compacted in thin lifts to achieve <br /> this compaction. This compaction also serves to greatly improve the slope stability of the <br /> permanent pile. <br /> M-2012-032 <br /> Amendment 02 Exhibit U <br /> December 2021 U-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.