My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-07_REVISION - M2012032 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-12-07_REVISION - M2012032 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:13:15 AM
Creation date
12/7/2021 10:52:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
12/7/2021
Doc Name Note
Exhibit L: Reclamation Costs
Doc Name
Proposed Revision Materials
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEMOLITION WORK <br /> Task description: Disposal of Chemicals-Per TR-14 <br /> Site: Revenue Mine Permit Action: TR-16 Permit/Job#: M2012032 <br /> PROJECT IDENTIFICATION <br /> Task#: 01B State: Colorado Abbreviation: None <br /> Date: 9/2/20219:59:16 County: Ouray Filename: M032-01b <br /> AM <br /> User: ACY <br /> Agency or organization name: DRMS <br /> UNIT COSTS Location adiustment: 87.60 % <br /> Structure or Item Demolition Menu <br /> Description Dimensions Selection Quantity Unit Unit Total Cost <br /> Cost <br /> Lime 2x 1800 lb Dump fees- 2.00 CY $11.10 $22.20 <br /> Super Sacks Reclamation station, <br /> usual charge <br /> Xanthate(Nax, 4x 50 lb bags Hazardous waste 0.10 TON $2,608.20 $260.82 <br /> Flottec SIPX removal-Bulk solids, <br /> Collector) small quantities(up to <br /> 1.5 tons) <br /> MIBC(OrePrep F- 2x 55 gal drum Hazardous waste 2.00 DRUM $680.65 $1,361.30 <br /> 549,Polyfroth W20) removal-Drum <br /> solids/liquids,per drum, <br /> (1-6 drum job) <br /> Aerophine 3418A Ix 55 gal drum Hazardous waste 1.00 DRUM $680.65 $680.65 <br /> removal-Drum <br /> solids/liquids,per drum, <br /> (1-6 drum job) <br /> Sodium 10x 50 lb bags Hazardous waste 0.25 TON $2,608.20 $652.05 <br /> Metabisulfate removal-Bulk solids, <br /> small quantities(up to <br /> 1.5 tons) <br /> Copper Sulfate lOx 50 lb bags Hazardous waste 0.25 TON $2,608.20 $652.05 <br /> removal-Bulk solids, <br /> small quantities(up to <br /> 1.5 tons) <br /> AeroFloat 242 Ix 55 gal drum Hazardous waste 1.00 DRUM $680.65 $680.65 <br /> (DanaFloat 067) removal-Drum <br /> solids/liquids,per drum, <br /> (1-6 drum job) <br /> Zinc Sulfate 10x 50 lb bags Hazardous waste 0.25 TON $2,608.20 $652.05 <br /> removal-Bulk solids, <br /> small quantities(up to <br /> 1.5 tons) <br /> Hyperfloc AF-309 4x 501b bags Hazardous waste 0.10 TON $2,608.20 $260.82 <br /> removal-Bulk solids, <br /> small quantities(up to <br /> 1.5 tons) <br /> Transportation-Lime 2 CY Hauling only,per mile, 53.00 MI $7.61 $403.33 <br /> 12-18 CY truck-30 <br /> mph average speed <br /> Total Cost <br /> Subtotal (adjusted for <br /> Job Hours: 16.00 (unadjusted): $5,625.92 location): $4,928.31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.