My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-07_REVISION - M2012032 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-12-07_REVISION - M2012032 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:13:15 AM
Creation date
12/7/2021 10:52:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
12/7/2021
Doc Name Note
Exhibit L: Reclamation Costs
Doc Name
Proposed Revision Materials
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task#TTT Page 2 of 2 <br /> Misc Debris-Disposal TR-11 PAR Dump fees-Building 150.00 CY $11.10 $1,665.00 <br /> pg.25 construction materials. <br /> Misc Debris- TR-11 PAR pg. Hauling only,per mile, 390.00 MI $7.61 $2,967.90 <br /> Transport 25 12-18 CY truck-30 <br /> mph average speed <br /> 2x Equipment TR-16 Bldg.(SN)demo./on- 114,000.00 CF $0.20 $22,914.00 <br /> Storage Shed- site disposal in existing <br /> Building Demo pit or cut-Max.200 ft. <br /> push <br /> 2x Equipment TR-16 Demo.and on-site 68.00 LF $6.05 $411.40 <br /> Storage Shed-Footers disposal in existing pit, <br /> 1.5 ft.x 2 ft.-Max.200 <br /> ft.push <br /> Security Building- TR-16 Hauling only,per mile, 53.00 MI $7.61 $403.33 <br /> Load and transport 12-18 CY truck-30 <br /> mph average speed <br /> Equipment Wash TR-16 Demo.and on-site 490.00 SF $1.01 $493.92 <br /> Area-Slab disposal in existing pit, <br /> 6 in.thick-Max.200 ft. <br /> push <br /> Equipment Wash TR-16 Demo.and on-site 120.00 LF $3.90 $468.00 <br /> Area-curbing disposal in existing pit, <br /> 1.0 ft.x 2 ft.-Max. 50 <br /> ft.push <br /> Remove Diesel TR-16 Haul tank to certified 1.00 EA $1,050.00 $1,050.00 <br /> Storage Tank- salvage dump-9,000 to <br /> Generator 12,000 gal.tank <br /> Materials Storage TR-11 PAR pg. USER PROVIDED 3.00 EA $500.00 $1,500.00 <br /> Convex 25 ITEM <br /> Total Cost <br /> Subtotal (adjusted for <br /> Job Hours: 180.00 (unadjusted): $112,516.75 location): $98,564.67 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.