Laserfiche WebLink
Table D-4 Life of Mine Timeline <br /> Mill Construction August 2020 September 2021 +1 <br /> Development Mining January 2020 Ongoing +9 <br /> Resue Mining September 2021 December 2028 +8 <br /> Mill Operations September 2021 December 2029 +9 <br /> Reclamation January 2030 December 2035 +5 <br /> +14 years total <br /> 7 TEMPORARY CLOSURE <br /> Should market conditions or other circumstances require a temporary shutdown of mine operations,the <br /> Mine will provide notice to DRMS in accordance with Section 1.13.5 of the Colorado Hard Rock/Metal <br /> Mining Rules and Regulations. During non-operating periods, Ouray Silver Mines will maintain the <br /> buildings, drainage structures,ponds, roads, and other surface facilities in a safe and environmentally <br /> acceptable condition. Underground openings, gates, and buildings will be locked to discourage <br /> unauthorized access when mine personnel are not present. <br /> Revenue Mine <br /> Amendment 02 D-19 <br /> December 2021 <br />