My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-02_PERMIT FILE - M2021067 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021067
>
2021-12-02_PERMIT FILE - M2021067 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2025 7:28:07 AM
Creation date
12/7/2021 9:29:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021067
IBM Index Class Name
Permit File
Doc Date
12/2/2021
Doc Name
Application
From
Asphalt Specialties CO Inc
To
DRMS
Email Name
ECS
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Mine Phase 2 and 3-Typically,the mining of each mine phase and block will progress <br /> beginning at the outer edge of the block where material will be moved toward the interior of <br /> the block to allow for excavation of the exterior perimeter and slope. The mining slope is <br /> set up for the entire perimeter of the block in 6 to 12 feet lifts. Depending on the soil conditions <br /> met during mining,the excavation face may adjust between a 1H:1V and 3H:1V slope to <br /> bedrock.Temporary excavation slopes and temporary stockpiled material slopes may be <br /> steeper,as they are temporary.All slopes will be maintained for site safety and to minimize <br /> material erosion. Excavated mine slopes will be backfilled against with backfill material and no <br /> mine slopes will remain. Mining of the aggregate material will progress down to the underlying <br /> shale bedrock. <br /> 7. Mine Phase 4 will include striping and stockpiling of the topsoil and overburden prior to mining. <br /> Topsoil will be stored in phase 4, mine block 4d. No other operations will take place in phase 4 <br /> until mining is approaching completion in phase 3, otherwise operations will follow the above <br /> description for Mine Phase 2 and 3. <br /> S M KATM MM <br /> rr�rb.grz, ir�on.�.- 1 <br /> _ w w w w - - w --a-i -4-r -- - -- - <br /> ja <br /> PhgeA_ lllYe4 <br /> 8 <br /> - -- -- --- -- - - - - - <br /> >I< <br /> _— _ d 91i4lll��p <br /> lIOTPU1gIgglfE s — _—— — ` — w —_ <br /> WnePlrreg oYaaYxia <br /> MBte81o0cJs, awimagaras � i <br /> WFTPIAMg1gE <br /> !h1llKJp <br /> niraalon of <br /> ►+Yang OM a <br /> - -•,fit' .a.�3"t��` d_ 2�s#:, ._ -._. <br /> MINING DIAGRAM — Mine Phase, Mine Block and Mining Direction <br /> 8. Dewatering trenches, pump basins,ditches,and pumps will be installed prior to the excavation <br /> of aggregate material from any mine block.All mine phases and blocks will include the <br /> dewatering trenches around the perimeter that will be placed at the toe of each successive <br /> 3H:1V mining slope. The aggregate material is ±36 feet deep. As a mine block is mined <br /> deeper, the dewatering trench will be lowered and moved laterally along the t3H:1V slope <br /> HAPlts HBP Plants\EVANS\Stiles Mining Resource\Exh D-Mine Plan\Mine Plan Draft.do" <br />
The URL can be used to link to this page
Your browser does not support the video tag.