3. Mining-The mine is organized into four(4)mine phases with twelve(12)mine blocks(1A-B, 2A- <br /> B, 3A-D,and 4A-D).The mine blocks vary in size from 10 to 13 acres. <br /> a. Mining Direction- <br /> i. Mine Phase 1, Block 1A and 1B—mining will occur from west to east. <br /> ii. Mine Phase 2 through 4 and their individual mine blocks—mining will occur <br /> from North to South as illustrated on the following mining diagram. <br /> b. Initially, mine phase 1,2 and 3, (t75 acres)will have the topsoil and overburden striped, <br /> t3 feet,and placed in temporary stockpiles. No dewatering trenches will be installed <br /> during the first striping operations. <br /> i. Mine Phase 2 and 3's aggregate deposit will remain exposed until mining <br /> catches up with this initial stripping operations. <br /> ii. This overburden material will be used to backfill the hot plant(1A)and wet <br /> plant(1B)aggregate excavations. <br /> c. Mine Phase 1 -The hot plant site and recycle material yard(Mine Block 1A)and wet <br /> plant site (Mine Block 113)aggregate material will be mass excavated and placed in raw <br /> aggregate stockpiles. <br /> i. The Phase 1A and 1B aggregate material will be excavated down to ground <br /> water and stockpiled at the mass aggregate stockpile area (t10 acres). <br /> ii. The dewatering trenches,first pump basin and pumps will be installed prior to <br /> the removal of wet material from the mass excavation. <br /> iii. The Phase 1A and 1B aggregate mass excavation will be completed down to the <br /> bedrock subgrade and placed in a raw aggregate stockpile for future processing. <br /> iv. The mine area will be filled and compacted with the overburden excavated from <br /> the first striping of Phases 1,2 and 3. The sites will be finished with gravel to <br /> facilitate future industrial land uses within 1 year of permit approval. <br /> v. No topsoil will be spread on mine blocks IA or 16. <br /> d. Truck scales and the mine office will be installed with any required utilities. <br /> e. The hot plant site will be graded for installation of the permanent hot plant equipment. <br /> f. Recycle aggregate crushing and screening equipment will move on site(IA)and begin <br /> processing the waste materials into usable recycled aggregate materials ready for sale <br /> or use at the asphalt hot plant. <br /> g. The wet plant site will be backfilled and graded for installation of the permanent wet <br /> plant equipment and infrastructure. <br /> h. The wash plant and asphalt hot plant will begin producing products for sale and use in <br /> the community. <br /> i. The establishment of the hot plant and wet plant sites by using the overburden that is <br /> excavated from Phases 1,2 and 3 will affect±75 acres. <br /> 4. Phase 1 extracted raw material stockpiles will be reduced and processed in advance of starting <br /> the mining in Phase 2.These crushing and screening operations will process aggregate materials <br /> from the mass stockpile for t2 years prior to the start of mining operations in phase 2. <br /> S. The overall time needed to complete the mining is estimated to be 40 years. Maximum <br /> production is expected to be 300,000 tons per year. Due to market and economic <br /> considerations, mining could progress faster or slower than expected and more time may <br /> be needed for mining and reclamation of the site. <br /> H•\Pits HBP Plants\EVANS\Stlks Mining Resource\Ezh D-Mine Plan\Mine Plan Draft.docz <br />