Laserfiche WebLink
Treiber B is located downstream of Treiber A and upstream of the future Currie A. The pond <br /> currently does not have any inlet or outlet infrastructure. Treiber B is currently storing water <br /> and is expected to be dewatered in October, 2014, for construction of the Treiber A to <br /> Treiber B interconnect. Topographic data was not provided to GEI for Treiber B. <br /> 1.3 Scope of Work <br /> GEI was retained by the Tri-Districts to develop designs for the Overland Pond/Treiber <br /> Reservoir interconnects. A summary of the scope of work performed by GEI for this work is <br /> presented below: <br /> • Design an energy dissipation system for the outfall of the 24-inch HDPE in <br /> Overland Ponds Pond 1; <br /> •, Design intake and energy dissipation systems for the existing 26-inch HDPE pipe <br /> in Overland Ponds Pond 2; <br /> • Design the intake and energy dissipation systems associated with the existing 25- <br /> inch interconnect between Overland Ponds Pond 2 and Overland Ponds Pond 3; <br /> • Design the interconnect pipeline between Treiber A and Treiber B and associated <br /> intake and energy dissipation structures; <br /> • Design the interconnect pipeline between Overland Ponds Pond 2 and Treiber B <br /> and associated intake and energy dissipation structures; <br /> • Prepare Construction Drawings and Specifications; and <br /> • Prepare a Design Report documenting the designs of the structures and pipelines. <br /> 1.4 Authorization <br /> GEI performed the services described in this report under the terms and conditions of the <br /> agreement between GEI and the Tri-Districts dated May 23, 2014. <br /> 1.5 Project Personnel <br /> The following GEI personnel were primarily responsible for performing the project analyses <br /> and designs and for preparing this report: <br /> Project Manager: Jeremy Deuto, PG, EIT <br /> Engineer of Record/Structural Engineer: Paul Eggers, PE <br /> Water Resources Engineer: Kerri Price, PE <br /> Geotechnical Engineer: Andrew Lockman, PG <br /> Project Reviewer: Chad Masching, PE <br /> The tunneling/subsurface investigations were conducted by Brierley Associates under a <br /> subcontract to GEI. <br /> GEI Consultants,Inc. Introduction 13 <br />