4 November 2021 C-1981-010/Trapper Mine RAR <br /> Inspection Topic Summary <br /> NOTE:Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued <br /> NA=Not Applicable <br /> R -Air Resource Protection R - Roads <br /> N -Availability of Records Y - Reclamation Success <br /> R -Backfill& Grading R -Revegetation <br /> N -Excess Spoil and Dev. Waste Y - Subsidence <br /> R -Explosives Y - Slides and Other Damage <br /> Y -Fish& Wildlife R - Support Facilities On-site <br /> R -Hydrologic Balance R - Signs and Markers <br /> R -Gen. Compliance With Mine Plan NA - Support Facilities Not On-site <br /> NA - Other NA - Special Categories Of Mining <br /> NA - Processing Waste R -Topsoil <br /> COMMENTS <br /> This was a partial inspection of the Trapper Mine;permit C 1981010,operated by Trapper Mining Inc. <br /> The inspection was conducted and the report and photos prepared by me, Robin Reilley of the Division. <br /> Graham Roberts,Trapper Mine representative,was present throughout the inspection. Skies were clear <br /> and the air was calm. Temperatures ranged between 40 and 60 degrees Fahrenheit. The ground was <br /> saturated after recent rains leaving the access roads inaccessible. Haul roads although muddy,were in <br /> good repair and passable. Cows were grazing on the lower north facing slopes at the west end of the site. <br /> PERMITTING ACTIONS in PROGRESS: <br /> o SL23 Phase III bond release. <br /> UPCOMING PERMITTING ACTIONS <br /> OUTSTANDING MAINTENANCE <br /> 1. Pond dredging is ongoing, Deal system is next in line for dredging. <br /> 2. Tires at bottom of west facing slope at the ash pit are piled up. These should be spread out and <br /> laid flat so that when compaction takes place no voids are present. <br /> 3. Ditch reconstruction along the north edge of the N pit to handle surface flow. <br /> 4. Clearing vegetation below the flume at No Name Pond#5 is needed. <br /> MAINTENANCE ITEMS ADDRESSED: <br /> East Pyeatt Pond was being dredged at the time of inspection. <br /> INSPECTION <br /> GENERAL MINE PLAN COMPLIANCE: <br /> Activities in the L,N and I/J pits were observed and appear to be progressing as permitted. The Queen <br /> Anne was idle in the N pit at the time of inspection. The dragline will finish moving overburden at the <br /> east end of the pit in the near future. One dragline is operating, casting spoil in the L pit; and one <br /> dragline is idle. A parting shot blast was observed in L dip pit. High wall mining in I/J pit is scheduled to <br /> begin in December 2021. Water was pooled at the northwest wall of the I/J pit and is pumped on an as <br /> needed basis. Coal was being loaded from the Q seam in N pit. Coal, overburden and ash were being <br /> hauled. No offsite air quality or hydrologic issues were observed at the time of inspection. <br /> Number of Partial Inspection this Fiscal Year: 5 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 2 of 8 <br />