Aggregate Industries, Morrison Quarry <br />Amendment No. 7 to Permit M-1973-021 <br />Morrison, CO <br /> <br />October 2021 | 39 <br />Costs for QA/QC testing assume a daily unit rate for reclamation of mined areas of the North <br />and South Quarries. For purposes of cost estimating it is assumed up to 120 days will be <br />needed. <br />Item 9.0 Un-mined Areas Earthwork <br />Areas disturbed within the Morrison Quarry, but outside of mining boundaries, will be reclaimed <br />to blend with surrounding topography. This earthwork includes rough grading of approximately <br />50.82 acres. Areas to be reclaimed include haul roads, processing areas, and structure <br />foundations. For areas where steeper slopes will remain, up to 0.33 acre of geosynthetic slope <br />stabilization will be installed. <br />Item 10.0 Soil Conditioning <br />All reclamation areas within the Morrison Quarry will be reclaimed in a manner that allows for <br />proposed post-mining land use. Reclamation areas will be backfilled as described in Items 8.0 <br />and 9.0, then covered with a layer of growth medium material. The growth medium material will <br />be developed from a blend of any available topsoil stockpiled on site as well as material <br />available from the excavation and breakdown of the fine-grained sedimentary overburden rock, <br />supplemented as needed by imported topsoil, biosolids, or compost and then blended, scarified, <br />seeded, and mulched. <br />The topsoil materials will be transported using front-end wheel loaders or articulating haul <br />trucks. This material will then be uniformly spread in 6-inch layers and mixed with conventional <br />earthmoving equipment, such as bulldozer rippers or the teeth of an excavator bucket, into the <br />top 12 inches of the subsoil. For reclamation of the mined and un-mined areas, it is anticipated <br />that the soil conditioning area covers approximately 155.4 acres. For purposes of estimating <br />costs (Exhibit L – Reclamation Costs), Aggregate Industries, Inc. estimates that up to 25% of <br />the required topsoil sources will be collected and stockpiled on site, providing an assumed <br />31,339 cubic yards of topsoil. To provide 6 inches of topsoil cover for the remaining 75% of <br />reclamation areas, Aggregate Industries, Inc. estimates importing 94,017 cubic yards of organic <br />material to meet the requirements below. The costs of utilizing topsoil sources on site versus <br />imported soil growth medium have been broken out as separate lines in the estimated costs <br />table in Exhibit L – Reclamation Costs. To reduce the dependency on imported topsoil, the <br />operator will continue to evaluate amending site soils to develop suitable organic material prior <br />to full reclamation of the site. <br />Imported soil amendments will be from a local source of material to be generated during <br />reclamation. Caked or lumpy soil amendments will not be accepted. If selected as the preferred <br />source, manure will be dry cow, horse, or sheep manure that has been stockpiled for a <br />minimum of 1 year. Manure will not be so caked or lumpy that it cannot be spread uniformly. <br />Compost manure will be stabilized through at least one heating cycle (120 to 140 degrees <br />Fahrenheit), turned at least once, windrowed for at least 45 days, and stockpiled for a least <br />2 months. Biosolids or compost biosolids, containing municipal biosolids, will meet Colorado <br />Department of Public Health and Environment (CDPHE) Water Quality Control Commission 5 <br />Code of Colorado Regulations 1002-64 Biosolids Regulation No. 64, including permitting and