Laserfiche WebLink
Aggregate Industries, Morrison Quarry <br />Amendment No. 7 to Permit M-1973-021 <br />Morrison, CO <br /> <br />October 2021 | 38 <br />revegetation (20H:1V). Compaction will be performed with tracked equipment (D9 bulldozer) <br />performing a minimum number of passes to achieve specified densities. The South Quarry <br />(below El. 7,000) is estimated to require aggregate fill volume of 137,491 cubic yards to reclaim <br />through Phase III. <br />The average haul distance for the South and West Quarry fill areas from the Central Quarry <br />stockpile area is 1.15 miles (El. 7,000 bench). Final grading of all fill slopes, benches, crest <br />areas, and toe areas will ensure that water is not allowed to pond on or adjacent to the fill <br />slopes. Grading will be performed to the proposed slope gradients shown in the Grading Plan <br />(Exhibit F.1 through Exhibit F.3). Final subgrades will be developed using survey equipment <br />from Item 4.0 and a CAT D9 bulldozer or CAT 349 excavator. Final grades, with topsoil <br />included, will be developed using an excavator to lightly spread out the organic material and <br />prevent compaction. <br />Quality assurance and quality control testing shall be performed in accordance with the <br />specifications for the soil placement, lift thickness, compaction and moisture density <br />requirements. Benches will be constructed at contour intervals described above and will be <br />sloped with grades no steeper than 2H:1V. All fill material will be placed as follows: <br />• Placed in loose, horizontal lifts not to exceed 30-inches thick, based on the maximum <br />particle size of the fill materials; maximum rock sizes are limited to two-thirds of the lift <br />thickness <br />• Compacted to achieve greater than 95% of the maximum dry density determined in <br />accordance with ASTM D698 and specified in AM05 <br />• Placed in a manner that allows for a moisture content within 3% of optimum based on <br />ASTM D698 <br />Testing for in-place density and moisture content will be performed in accordance with ASTM D <br />6938. Testing will be performed by the operator (or their subcontractor) on a frequency of one <br />test for each lift of fill placed. Documentation will include the following components: <br />• Quality Control testing results for the manufacture of fill materials <br />• Daily QA reports during fill operations <br />• Weekly construction reports during reclamation of the fill slopes <br />• Nuclear density and compaction testing summaries <br />• Lift thickness testing and verification summaries <br />• QA lab testing per technical specification requirements and frequencies <br />• Record ambient fill material temperatures as specified <br />• Photographic documentation of each element and stage of construction <br />• Additional construction monitoring and testing as directed