Laserfiche WebLink
Aggregate Industries, Morrison Quarry <br />Amendment No. 7 to Permit M-1973-021 <br />Morrison, CO <br /> <br />October 2021 | 18 <br />Instead, mining will continue at the 40-foot highwall configuration with a minimum 40-foot bench <br />configuration. <br />Phase III Quarry Development Narrative <br />Mining and reclamation will proceed from the present configuration (Exhibit C.2), using the <br />same mining methods described in AM05. One modification to mining methods is the use of a <br />portable crushing plant, referred to as the Road Base Processing Plant, located on the northern <br />end of the South Quarry, to process rock for use in road development and reclamation activities. <br />This plant will be removed and used at other sites when it is no longer needed (refer to <br />Exhibit C.2 for its current location). <br />The sequence of mining activities remains unchanged from AM05, which described mining as <br />generally occurring on two "fronts" simultaneously: one continues South Quarry development, <br />and one develops the West Quarry. Exhibit D.2 presents the Phase III buildout configuration <br />plan view and Exhibit D.2a through Exhibit D.2c present the Phase III buildout configuration <br />cross sections. The mining plan assumes a bottom elevation of El. 6,505; these numbers reflect <br />planned benching in this area and average groundwater well water levels surrounding the South <br />Quarry. The configuration reflects currently mined bench configurations and the maximum <br />bench configurations identified in the previous section for areas where future mining will occur. <br />Of note, the bench configurations identify some exceptions to the maximum configurations to tie <br />future mining benches into completed benches in the South Quarry. <br />Any changes in the identified bench configurations identified in this Mining Plan will be <br />documented via the technical revision process for purposes of documenting other than minor <br />effects upon the approved Reclamation Plan. <br />West Quarry Haul Road <br />Construction of the West Quarry Haul Road, a structure necessary to re-establish access to the <br />upper benches of the South Quarry and commence West Quarry development, is underway and <br />is scheduled for completion in late fall 2021. The Haul Road plans were summarized in <br />Technical Review (TR07) and approved in July 2020. TR07 included the haul road design <br />specifications and proposed configuration, but recognized that the final road alignment was <br />pending and would be finalized in conjunction with AM07. Since the start of construction, fill <br />material limitations have resulted in a change to the road alignment to maximize the use of cut <br />material. Appendix 2 presents the final West Quarry Haul Road design, and Exhibit D.1 <br />presents the final West Quarry Haul Road configuration. As mining and reclamation continues in <br />the South and West Quarries, the haul road will be removed and reclaimed as benches <br />progress eastward. <br />South Quarry Development <br />The South Quarry will be developed to a maximum depth before groundwater is encountered. <br />Groundwater monitoring wells located north, south, and east of the South Quarry (MW2019-03, <br />MW2019-02, and MW2019-01) show average water level elevations of 6,495, 6,581 and 6,459 <br />feet, respectively. Based on these water levels, it is assumed that South Quarry base elevations