My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1973021 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
_REVISION - M1973021 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2021 9:04:39 AM
Creation date
11/5/2021 8:51:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Name Note
AM07 Final
Doc Name
Adequacy Review Response #3
From
Aggregate Industries
To
DRMS
Type & Sequence
AM7
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aggregate Industries, Morrison Quarry <br />Amendment No. 7 to Permit M-1973-021 <br />Morrison, CO <br /> <br />October 2021 | 17 <br />concluded that 40H:70V bench configurations at El. 7,000 and El. 6,650 had a corresponding <br />global stability factor of safety (FOS) greater than 1.25, considering both competent and poor <br />rock conditions. Local stability FOS evaluations provided similar results at El. 7,000. Less <br />favorable results were documented at El. 6,650; however, the geotechnical consultant <br />recommended a 40-foot-wide bench at this elevation to meet stability criteria. Adopting a lower <br />60-foot highwall and wider 40-foot bench in this amendment for all mining at these elevations <br />results in a FOS that meets or exceeds the minimum requirements. <br />As has been successful with South Quarry operations to date, monitoring the mine highwalls will <br />continue in accordance with the South Quarry monitoring plan, which utilizes control points fixed <br />to concrete-filled 55-gallon drums and a visual monitoring program. This plan will be <br />supplemented to include quarry face monitoring using Light Detection and Ranging (LiDAR) <br />scan of the rock face, a recommendation from the 2020 Geotechnical Stability Exhibit. <br />Monitoring will be increased to a minimum of biannual inspections and will be conducted by a <br />qualified geotechnical professional. These inspections will be documented in technical reports <br />and summarized in the annual Geotechnical Addendum. Biannual monitoring will support <br />prompt identification of rock instabilities in completed highwalls, ensuring these issues are <br />promptly addressed—via catchment berms, rock scaling, buttressing, or other techniques—to <br />support safe mining and reclamation working conditions. <br />Below El. 6,600: 40H:40V Benches and application of the Observational Method <br />The 2020 Geotechnical Addendum (Figure 7) identified the potential for large deposits of poor <br />quality rock (e.g., sillimanitic gneiss) in the South Quarry below El. 6,600. Large deposits of poor <br />quality rock may require more conservative slope configurations to safely mine these areas. As <br />mining has not advanced below El. 6,600, there is insufficient information to predetermine <br />absolute final slope configurations below this elevation. As a result, consistent with Amendment <br />Nos. 3, 4, and 5, the “Observational Method” will be used to support mining in these areas. <br />The “Observational Method” has been modified to reflect proposed operations (see Exhibit D.3). <br />Below El. 6,600, operations will mine to an initial 40-foot bench and 40-foot highwall <br />configuration. This conservative configuration was recommended in Appendix 1 for areas of <br />sillimanitic gneiss and will allow for mining to safely proceed while a qualified geotechnical <br />professional observes and evaluates exposed rock. It is anticipated that these observations will <br />be conducted biannually, and initial observations will focus on geologic mapping and visual <br />observations. The results of these observations will be documented in technical reports and <br />summarized in the annual Geotechnical Addendum. <br />If observations identify favorable conditions for potentially steeper configurations <br />(e.g., competent rock, fault orientation), a qualified geotechnical professional will conduct <br />additional mapping and laboratory testing necessary to conduct a stability evaluation to support <br />a steeper (i.e., 40H:60V) bench configuration. If evaluations result in a FOS greater than 1.25, <br />the results of this analysis will be presented in a technical revision that will be submitted to the <br />Division of Reclamation, Mining and Safety for review and approval. Mining at configurations <br />steeper than 40H:40V will not proceed without DRMS approval. Conversely, if large quantities of <br />poor quality rock are present or instabilities are identified, a steeper bench will not be pursued.
The URL can be used to link to this page
Your browser does not support the video tag.