Laserfiche WebLink
West Elk Mine <br /> bulk rock dust bin and compressor building, potable water treatment plant, wastewater treatment <br /> plant, coal stack tubes, crushing and screening facilities, and a coal preparation plant and associated <br /> coal handling facilites (see Section 2.05.3(7)). All of these facilities are on land owned by MCC. <br /> Expanded descriptions for some of these facilities are provided below. A few facilities are located <br /> in outlying areas, including the unit-train loadout(Map 53); facilities in Sylvester Gulch(Map 5313), <br /> which include ventilation shafts, the F Seam ventilation fan, mine dewatering and treatment <br /> facilities, substation; and other support facilities. Detailed descriptions of the Sylvester Gulch <br /> facilities are included in Exhibit 69. <br /> Office and Bathhouse <br /> MCC completed an office and bathhouse building in September 1992 (Map 53). This building is <br /> approximately 20,000 square feet and consists of two floors. The bathhouse facilities and <br /> operations offices occupy the lower floor. The engineering and administration offices occupy <br /> the upper floor. An as-built construction description is provided in Exhibit 68. A small skid- <br /> mounted shed was added at the foot-bridge entrance to the office building in 2020. <br /> Warehouse <br /> MCC expanded the warehouse facilities by converting the former maintenance shop to warehouse area, <br /> adding a third level mezzanine inside the existing building and constructing an office addition. The <br /> building is approximately 6,000 square feet on the ground level. Warehouse offices, purchasing offices, <br /> and material storage occupy the first floor. Additional material storage and offices are located on the <br /> second and third level mezzanines. An as-built construction description is provided in Exhibit 68. <br /> Maintenance Shop <br /> Construction of a maintenance shop was completed in June 1993. The 15,000 square foot shop <br /> consists of two levels. The ground floor includes six service bays, including a welding bay and a <br /> wash bay. The second level mezzanine, located in the back half of the building includes offices, a <br /> library, a lunch-room, and a locker room. An as-built construction description is provided in <br /> Exhibit 68. <br /> Three-Sided Warehouse and Tire Storage Racks <br /> In addition to the main warehouse, material storage is provided in the three-sided warehouse. This <br /> 4,400 square foot, open-front building contains five bays for materials storage. In addition, MCC <br /> constructed tire storage racks to the west of the warehouse building, adjacent to an existing bin wall. <br /> The racks are constructed of wood cribbing that will be open on all sides and covered by light gage <br /> roofing. As-built descriptions of these structures are provided in Exhibit 68. <br /> Surface Shop Building <br /> The surface shop building is used for maintenance of surface equipment. The 4,130 square foot <br /> building consists of two service bays, a line-up area and a covered area used for sand and gravel <br /> storage. A dozer service facility (approved per MR-229) is planned to be located adjacent to the <br /> 2.05-17 Rev. 06105, O1106, 03106, 04106& 05/06-PRIG; 01/09-MR350; 04/09- TR116,' 04/09-MR353; 05/09-MR354; 08109- TR118; <br /> 08/09-TR119,09/12-MR387; 11/12-MR390;07/18-PR15;11/18-MR430;MR438-09119;MR439-11119;07/20-MR447 <br />