Laserfiche WebLink
West E1kMine <br />bulk rock dust bin and compressor building, potable water treatment plant, wastewater treatment <br />plant, coal stack tubes, crushing and screening facilities, and a coal preparation plant and associated <br />coal handling facilites (see Section 2.05.3(7)). All of these facilities are on land owned by MCC. <br />Expanded descriptions for some of these facilities are provided below. A few facilities are located <br />in outlying areas, including the unit -train loadout (Map 53); facilities in Sylvester Gulch (Map 53B), <br />which include ventilation shafts, the F Seam ventilation fan, mine dewatering and treatment <br />facilities, substation; and other support facilities. Detailed descriptions of the Sylvester Gulch <br />facilities are included in Exhibit 69. <br />Office and Bathhouse <br />MCC completed an office and bathhouse building in September 1992 (Map 53). This building is <br />approximately 20,000 square feet and consists of two floors. The bathhouse facilities and <br />operations offices occupy the lower floor. The engineering and administration offices occupy <br />the upper floor. An as -built construction description is provided in Exhibit 68. <br />Warehouse <br />MCC expanded the warehouse facilities by converting the former maintenance shop to warehouse <br />area, adding a third level mezzanine inside the existing building and constructing an office addition. <br />The building is approximately 6,000 square feet on the ground level. Warehouse offices, <br />purchasing offices, and material storage occupy the first floor. Additional material storage and <br />offices are located on the second and third level mezzanines. An as -built construction description is <br />provided in Exhibit 68. <br />Maintenance Shop <br />Construction of a maintenance shop was completed in June 1993. The 15,000 square foot shop <br />consists of two levels. The ground floor includes six service bays, including a welding bay and a <br />wash bay. The second level mezzanine, located in the back half of the building includes offices, a <br />library, a lunch -room, and a locker room. An as -built construction description is provided in <br />Exhibit 68. <br />Three -Sided Warehouse and Tire Storage Racks <br />In addition to the main warehouse, material storage is provided in the three -sided warehouse. This <br />4,400 square foot, open -front building contains five bays for materials storage. In addition, MCC <br />constructed tire storage racks to the west of the warehouse building, adjacent to an existing bin wall. <br />The racks are constructed of wood cribbing that will be open on all sides and covered by light gage <br />roofing. As -built descriptions of these structures are provided in Exhibit 68. <br />Surface Shop Building <br />The surface shop building is used for maintenance of surface equipment. The 4,130 square foot <br />building consists of two service bays, a line-up area and a covered area used for sand and gravel <br />storage. A dozer service facility (approved per MR -229) is planned to be located adjacent to the <br />205-17 Rev 06/05, 01/06, 03/06, 04/06 & 05/06- PRIO, 01/09- MR350, 04/09- TRIM, 04/09- MR353, 05/09- MR354, 08/09- TR118, <br />08/09-TRl19; 09/12-MR387, 11/12-MR390, 07/18-PRI5 <br />