Laserfiche WebLink
034 Haul Clean Coal Stockpile to Development Waste SCRAPERI 1 20.43 $23,224 <br /> Pile <br /> 035 Replace Cover material on DWDA#2 SCRAPERI 1 2.29 $2,809 <br /> 036 Replace Topsoil to DWDA#2 SCRAPERI 1 5.40 $6,622 <br /> 037 Replace Topsoil to Area East of Pond 5 SCRAPERI 1 0.42 $516 <br /> 038 Replace Topsoil to Pond 005 SCRAPERI 1 0.30 $359 <br /> 039 Replace Topsoil to Area Under Conveyor SCRAPERI 1 0.90 $1,106 <br /> 040 Replace Topsoil to Raw Coal Storage Stockpile SCRAPERI 1 1.37 $1,675 <br /> 041 Replace Topsoil to Small DR Area in Large DNR SCRAPERI 1 0.10 $124 <br /> Area <br /> 042 Replace Topsoil to Clean Coal Stockpile SCRAPERI 1 0.93 $1,140 <br /> 043 Replace Topsoil to East Extension of River SCRAPERI 1 0.22 $269 <br /> Pumphouse <br /> 044 Replace Topsoil to Embedded Waste Area SCRAPERI 1 2.01 $2,471 <br /> 045 Replace Topsoil to RDA SCRAPERI 1 122.41 $150,090 <br /> 046 Replace Topsoil to Four Bench Slopes SCRAPERI 1 15.69 $19,421 <br /> 047 Replace Topsoil to RDA Pond SCRAPERI 1 5.17 $6,233 <br /> 048 Replace Topsoil to Bates Portal Face-Up SCRAPERI 1 3.01 $3,687 <br /> 049 Replace Topsoil to West DWDA SCRAPERI 1 67.00 $87,625 <br /> 050 Compact Final RDA Surface COMPACT 1 32.46 $5,971 <br /> 051 Seal Portals and Vent Shafts MINESEAL 1 270.00 $273,452 <br /> 052 Regrading 30,000 LCY Refuse(RDA) GRADER 2 4.14 $1,377 <br /> 053 Finish Grade Refuse Disposal Area GRADER 1 5.31 $929 <br /> 054 Finish Grade West DWDA Area GRADER 1 8.35 $1,460 <br /> 055 100 year ditch EXCAVATE 1 27.86 $3,618 <br /> 056 ReplaceTopsoil to Zig Zag Road EXCAVATE 1 0.47 $67 <br /> 057 Site Maintenance during the 10 year liability SITEMAINT 1 400.00 $40,516 <br /> period ENANCE <br /> 058 Rip Mine Entry Area Prior to Regrading RIPPER 3 8.56 $8,721 <br /> 059 Rip Wedge Area Prior to Regrading RIPPER 3 0.76 $781 <br /> 060 Rip Prep Plant Area Prior to Regrading RIPPER 3 2.57 $2,622 <br /> 061 Rip West Portal DNR Areas RIPPER 3 11.94 $12,169 <br /> 062 Rip East Portal-Only DNR Area RIPPER 3 16.78 $17,091 <br /> 063 Rip Zig Zag Road and Slurry Line Road RIPPER 3 0.44 $455 <br /> 064 Reseed RDA Borrow Area REVEGE 1 5.00 $6,261 <br /> 065 Reseed Facilities Area with Rangeland Mix REVEGE 1 178.00 $126,769 <br /> 066 Reseed RDA REVEGE 1 95.25 $39,756 <br /> 067 Reseed DWP with Rangeland Mix REVEGE 1 11.24 $7,350 <br /> 068 Reseed Disturbed Areas with Riparian Habitat REVEGE 1 21.14 $15,363 <br /> 069 Plant 6 Shrub Clumps REVEGE 1 5.60 $2,399 <br /> 070 Weed Control-Assume 1/4 of Area Three Times REVEGE 1 102.71 $19,583 <br /> 071 Seed Rangeland Seed Mix on MR Areas REVEGE 1 2.22 $4,447 <br /> 072 Reseed C&W Facilities Area with Rangeland Mix REVEGE 1 12.00 $7,820 <br /> 073 Reseed Zig Zag with Rangland Mix REVEGE 1 1.60 $2,122 <br /> 074 Reseed West DWDA Expansion Area with REVEGE 1 20.40 $13,295 <br /> Rangeland Mix <br /> 075 Seed NW Vent Fan and Access Road(TR72) REVEGE 1 1.55 $2,189 <br /> 076 Mobilize/Demobilize Equipment for Initial MOBILIZE 1 3.70 $14,840 <br /> Reclamation <br /> 077 Mobilize/Demobilize Equipment for Pond MOBILIZE 1 3.70 $1,535 <br /> Cleaning <br /> 078 Mobilize/Demobilize Equipment for Pond MOBILIZE 1 3.70 $1,410 <br /> Removal <br /> 079 Mobilize/Demobilize Equipment for Site MOBILIZE 1 3.70 $3,241 <br /> Maintenance <br />