My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-11-02_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2021-11-02_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2021 11:19:16 AM
Creation date
11/3/2021 11:51:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
11/2/2021
Doc Name
Adequacy Review #2
From
DRMS
To
New Elk Coal Company, LLC
Type & Sequence
PR5
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Cost Summary <br /> Site: New Elk Mine Permit Action: PR5 Permit/Job#: C1981012 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 10/29/2021 County: Las Animas Filename: C012-000 <br /> User: ME <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Backfill and Regrade East Portal Area DOZER 3 83.38 $84,916 <br /> 002 Push Temporary Coal Stockpiles to Conveyor DOZER 3 12.23 $11,328 <br /> 003 Regrade Pond 004 DOZER 1 7.81 $2,651 <br /> 004 Regrade Pond 006 DOZER 1 8.73 $2,864 <br /> 005 Regrade Pond 007 DOZER 1 21.50 $7,053 <br /> 006 Regrade Pond 008;Rip and Regrade Spillway DOZER 1 66.13 $22,068 <br /> 007 Regrade West Portal Containment Area 1 DOZER 1 5.21 $1,708 <br /> 008 Regrade temporary Ditches at West Portal DOZER 1 0.31 $95 <br /> 009 Backfill East Portal Face DOZER 3 0.93 $943 <br /> O10 Backfill West Portal Face DOZER 2 1.39 $911 <br /> Oil Backfill Bates Portal Face DOZER 2 38.69 $25,379 <br /> 012 Regrade Areas from MR-99,MR-107,MR-111, DOZER 3 1.43 $1,327 <br /> MR-114 <br /> 013 Replace Topsoil on D26 Extension DOZER 1 0.24 $73 <br /> 014 Backfill and Regrade DWDA Expansion DOZER 2 2.68 $1,820 <br /> 015 Replace Topsoil on Six Drill Pads and Mud Pits DOZER 1 3.88 $1,199 <br /> 016 Rip and Regrade C&W Train Shop Area DOZER 2 12.74 $8,647 <br /> 017 Regrade Access Road to NW Vent Shaft(TR72) DOZER 1 2.33 $590 <br /> 019 Strip and Place 5 acres of topsoil RDA TRUCKI 1 82.68 $63,274 <br /> 020 Strip and Place 10 acres of Cover over 2 feet from TRUCKI 1 287.66 $220,149 <br /> borrowRDA <br /> 021 Strip and Place 4 acres of Cover over 2 feet from TRUCKI 1 115.07 $88,061 <br /> RDA back <br /> 022 Strip and Place 5 acres of Cover over 2 feet from TRUCKI 1 236.40 $180,919 <br /> borrow RDA <br /> 023 Replace topsoil over borrow area RDA TRUCKI 1 53.94 $32,976 <br /> 024 Backfill and Regrade Transformer and Rock Dust TRUCKI 1 48.56 $56,080 <br /> Cut Slope <br /> 025 Replace Topsoil to Transformer and Rock Dust TRUCKI 1 1.40 $1,597 <br /> Cut Slope <br /> 026 Clean Ponds 004,007,and 008 Twice During TRUCKI 1 121.05 $105,007 <br /> Liability Period <br /> 027 Replace Topsoil on NW vent Fan Aea(TR72) TRUCKI 1 5.95 $2,230 <br /> 028 Demolish and Remove All Structures DEMOLISH 1 1,009.00 $1,960,889 <br /> 029 Demolish and Remove Structures C&W area DEMOLISH 1 24.00 $77,932 <br /> 030 Exploration Drilling TR-74 BOREHOLE 1 60.00 $45,724 <br /> 031 Plug and Seal All Boreholes and Monitoring Wells BOREHOLE 1 73.00 $146,843 <br /> 032 Seal Additional Wells BOREHOLE 1 36.00 $39,715 <br /> 033 Haul Raw Coal Stockpile to Development Waste SCRAPERI 1 12.59 $14,483 <br /> Pile <br />
The URL can be used to link to this page
Your browser does not support the video tag.