My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-10-29_PERMIT FILE - M2021064 (6)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021064
>
2021-10-29_PERMIT FILE - M2021064 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2025 2:39:38 AM
Creation date
11/1/2021 1:04:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021064
IBM Index Class Name
Permit File
Doc Date
10/29/2021
Doc Name
Application
From
C & J Gravel Products, Inc
To
DRMS
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M-2 OPERATIONS: <br /> Days and times, weather and ground conditions <br /> See Exhibit C. Operations will be conducted during daylight hours, generally Monday through Friday, with <br /> some extended hours and weekend work as needed for specific projects. During the peak construction season,there <br /> will be hauling on Saturdays, again only during daylight hours.Work at night and prior to 0600 will be limited to urgent <br /> equipment repair and maintenance and delivery of equipment. Operations other than loading and hauling will be <br /> curtailed in extreme weather conditions including high winds (greater than 20 mph sustained or gusts over 30 mph), <br /> heavy rain or snow. Haul of equipment and material may be delayed or reduced in weight and frequency during spring <br /> thaw and as ordered by Archuleta County Road Department and/or Sheriff. <br /> Hauling operations—the hauling season—will be done up to 270 days per year, with an estimated 80%of <br /> production hauled during 180 operating days (up to six days per week) and an estimated 20% hauled during the <br /> remaining 90 days(not more than five days per week). No hauling is proposed for Sundays or holidays. <br /> Production operations—the processing season when excavation,crushing and screening of materials will be <br /> done—will be at least 50 days per year,but may last up to 100 days per year. No processing is proposed for nighttime, <br /> Sundays,or holidays, and will be limited to weekdays as much as possible. <br /> Mobilization/demobilization (deployment) of processing equipment will normally require 3 to 4 days at the <br /> beginning and end of the processing season, usually once per year, and will not be done on Sundays or holidays. <br /> Light and visual impact <br /> While the forest to the East of the planned mining and plant area, and the forested Oakbrush Hill eastern <br /> and northern slope(to remain in dense forest)will reduce or eliminate visual impact and potential for light pollution to <br /> properties to the North, East, and West,there is some small potential for minor impact to the property to the South, <br /> and to skyglow.Therefore, operations will generally be limited to daylight hours, and if maintenance or other work is <br /> needed early morning or evening,full-cutoff lighting and orientation of lighting to reduce or prevent impacts off-site <br /> will be used. <br /> Operator requests authorization to request temporary extension(to time certain)of the County Development <br /> Director for extended operating hours to meet customer needs(example: CDOT or USFS projects). <br /> Blasting <br /> There will be no blasting done on site for the operation. <br /> Noise potential <br /> Noise impact of operations and traffic to and from the site on neighboring properties may exist but is expected to <br /> be relatively low due to terrain,distances, and operational procedures. <br /> The location of the site, east and south of the crest of Oakbrush Hill and well above the valley floor of Dutton <br /> Creek, and the dense forest will remain around the operations. Therefore, little if any problem with noise is expected, <br /> as with light, and noise reduction is taken into account in the overall design and selection of stockpile and plant <br /> locations,direction of working,and other noise control measures integrated into the operation. <br /> Typical sources of noise associated with sand and gravel extraction include operation of mobile and stationary <br /> equipment(engine,conveyor and like noises), back-up alarms, movements of vehicles inside and to and from the <br /> site(brakes, acceleration,etc.), and noises associated with heavy machinery and construction. During periods when <br /> traffic is not present on CR-600, other sounds carry well, but trees and the terrain help contain noise. <br /> The nearest dwellings are the Lemon Family Residence approximately 400 feet south of the south parcel boundary <br /> (and 800 feet from the proposed affected area). Other dwellings and occupied structures are a quarter-mile or more <br /> from planned operations and at least one-half-mile from the plant and stockpile/loading areas <br /> For the most part, the various buffers and distances ensure that operations are separated from all potential <br /> receptors, and noise levels will remain under the state-mandated 55 dBA at those receptors, and under the county- <br /> mandated 55 dBA at the parcel boundaries. <br /> Although expected to be rare,the operator may need to use pneumatic hammers and breakers to process large <br /> boulders and to produce certain products(such as riprap with a D50 spec>12-inch).This process may produce louder <br /> noises but is not expected to exceed the above limits. However,noise control for such operations is addressed below. <br /> C&J Gravel Products, Inc. Page 58 of 93 20 OCT 2021 <br /> Application for Permit: Oakbrush Hill Gravel M-2021- C&J-DPR-V5-001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.